Standard Operation Procedure
Tabulator
:
Issue Department
:
Xin-Xin Chen
NPSU-PPE
Auditor
:
Ethan Lai
Steps
:
Document No. : Pyxis400
DISASS’Y SOP Station :
Operation Name : Ver. :
Date :
Note: If finding anything uncommon, notice foreman or assistant at once.
Fixture list (Specification)
Qty.
Fixture list (Specification)
Qty.
Take out Vesa Mount
8(1/1)
2017/5/23
1.00
1. Unscrew (
×
5) all joints of Vesa Mount
illustrated as Fig. 1.
Torsion: 6.0
±
1.0 kgf.cm
Take the screwdriver vertically to the screw
holes.
Put the screws into the material box.
2. Follow the angle of the red line to take out
Vesa Mount (Fig. 2).
Glove Requirements: Half-finger gloves
Fig. 2
Fig. 1
图一
2
1
4
5
3