![HP ProLiant SL165s G7 Скачать руководство пользователя страница 36](http://html.mh-extra.com/html/hp/proliant-sl165s-g7/proliant-sl165s-g7_maintenance-and-service-manual_2175198036.webp)
Removal and Replacement Procedures 36
NOTE:
For SFF Hard Drive installation, refer to
HP 2 Drive SFF cage installation instruction
documentation for
more information.
WARNING:
Ensure that the system is powered off and all power sources have been disconnected
from the server. Voltages are present at various locations within the server whenever an AC power
source is connected. This voltage is present even when the main power switch is in the off position.
Front I/O Panel
To remove the front I/O panel:
1.
Unfasten the screws that secure the front I/O panel to the tray.
2.
Remove the front I/O panel.
Figure 8
Removing the front I/O panel
To install the Front I/O panel:
1.
Align the front I/O panel to the tray.
2.
Fasten the screws.
Содержание ProLiant SL165s G7
Страница 12: ...Customer self repair 12 ...
Страница 13: ...Customer self repair 13 ...
Страница 14: ...Customer self repair 14 ...
Страница 15: ...Customer self repair 15 ...
Страница 19: ...Illustrated parts catalog 19 ...
Страница 24: ...Illustrated parts catalog 24 ...
Страница 55: ...Removal and Replacement Procedures 55 Figure 38 Installing the system fan ...