Hardware options installation 57
Be sure to thread the cables through the rear of the non-hot-plug expansion cage into the server.
9.
Connect the cables to the SATA connectors 1-4 on the system board ("
System board components
" on
page
11
).
10.
Install the air baffle.
11.
Install the access panel (on page
22
).
12.
Do one of the following:
o
Close or install the tower bezel, as needed.
o
Slide the server back into the rack.
13.
Power up the server (on page
20
).
Removable media devices
This section provides the following information and procedures:
•
Identifying guide screws (on page
58
)
•
SATA optical drive option (on page
58
)
•
USB tape drive option (on page
60
)
•
Full-height tape drive option (on page
61
)
Содержание PROLIANT ML330 G6
Страница 1: ...HP ProLiant ML330 G6 Server User Guide Part Number 534305 002 March 2010 Second Edition ...
Страница 19: ...Component identification 19 Fan locations Standard fan configuration Redundant fan configuration ...
Страница 105: ...Troubleshooting 105 ...
Страница 122: ...Specifications 122 Maximum peak power 460 W at 100V to 120V AC input 460 W at 200V to 240V AC input ...
Страница 129: ...Technical support 129 ...
Страница 130: ...Technical support 130 ...