Hardware options installation 53
3.
Install the hard drive.
4.
Determine the status of the drive by observing the drive LEDs ("
Hot-plug SATA or SAS hard drive
LEDs
" on page
18
).
5.
Resume normal server operations.
Expansion hard drive cage option (hot-plug)
To install the component:
1.
Power down the server (on page
20
).
2.
Do one of the following:
o
Open or remove the tower bezel, as needed ("
Open or remove the tower bezel
" on page
20
).
o
Extend the server from the rack (on page
21
).
3.
Remove the access panel (on page
21
).
4.
Remove the air baffle (on page
22
).
Содержание PROLIANT ML330 G6
Страница 1: ...HP ProLiant ML330 G6 Server User Guide Part Number 534305 002 March 2010 Second Edition ...
Страница 19: ...Component identification 19 Fan locations Standard fan configuration Redundant fan configuration ...
Страница 105: ...Troubleshooting 105 ...
Страница 122: ...Specifications 122 Maximum peak power 460 W at 100V to 120V AC input 460 W at 200V to 240V AC input ...
Страница 129: ...Technical support 129 ...
Страница 130: ...Technical support 130 ...