Removal and replacement procedures 48
LFF drive carrier
To install the component:
1.
Unlock and remove the tower bezel ("
" on page
2.
Power down the server (on page
3.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
4.
Place the server on its side.
5.
Remove the access panel (on page
6.
If installed, remove the PCI air baffle (on page
7.
Remove the system air baffle (on page
8.
Remove the fans (on page
9.
Disconnect the drive cables from the drive.
10.
Remove the drive carrier.
Содержание ProLiant ML150 Gen9
Страница 12: ...Customer self repair 12 ...
Страница 13: ...Customer self repair 13 ...
Страница 14: ...Customer self repair 14 ...
Страница 29: ...Removal and replacement procedures 29 o Box 2 o Box 1 ...
Страница 78: ...Cabling 78 Cabling Front panel cabling Item Description 1 Front I O cable 2 USB 3 0 connector cable ...
Страница 86: ...Cabling 86 Cache module backup power cabling HPE Smart Storage Battery cabling ...