Removal and replacement procedures 41
a.
Position the heatsink on the processor backplate.
b.
Tighten one pair of diagonally opposite screws halfway, and then tighten the other pair of screws.
c.
Finish the installation by completely tightening the screws in the same sequence.
7.
Install the system air baffle.
8.
If removed, install the PCI air baffle.
9.
Install the access panel.
10.
Return the server to an upright position.
11.
Connect each power cord to the server.
12.
Connect each power cord to the power source.
13.
Power up the server.
14.
Install and lock the tower bezel.
Eight-bay SFF hot-plug drive cage
To remove the component:
1.
Unlock and remove the tower bezel ("
" on page
2.
Power down the server (on page
3.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
4.
Remove all drives ("
" on page
5.
Place the server on its side.
6.
Remove the access panel (on page
7.
If installed, remove the PCI air baffle (on page
8.
Remove the system air baffle (on page
9.
Remove the fans (on page
10.
Disconnect the two Mini-SAS cables and the power cable from the drive cage backplane.
Содержание ProLiant ML150 Gen9
Страница 12: ...Customer self repair 12 ...
Страница 13: ...Customer self repair 13 ...
Страница 14: ...Customer self repair 14 ...
Страница 29: ...Removal and replacement procedures 29 o Box 2 o Box 1 ...
Страница 78: ...Cabling 78 Cabling Front panel cabling Item Description 1 Front I O cable 2 USB 3 0 connector cable ...
Страница 86: ...Cabling 86 Cache module backup power cabling HPE Smart Storage Battery cabling ...