Operations 29
7.
Secure the full-length expansion board retainer.
8.
Install the access panel (on page
9.
Install the server into the rack ("
Installing the server into the rack
" on page
10.
Connect each power cord to the server.
11.
Connect each power cord to the power source.
12.
Remove the air baffle
CAUTION:
For proper cooling do not operate the server without the access panel, baffles,
expansion slot covers, or blanks installed. If the server supports hot-plug components, minimize
the amount of time the access panel is open.
To remove the component:
1.
Power down the server (on page
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Extend or remove the server from the rack ("
Extend the server from the rack
" on page
4.
Remove the access panel (on page
CAUTION:
Do not detach the cable that connects the battery pack to the cache module.
Detaching the cable causes any unsaved data in the cache module to be lost.
IMPORTANT:
It is necessary to remove the PCI riser cage only if there is a full-length expansion
board installed.
Содержание ProLiant DL388p
Страница 44: ...Hardware options installation 44 14 Install the heatsink 15 Remove the two fan blanks ...
Страница 82: ...Cabling 82 Cabling SAS hard drive cabling SFF hard drive cabling SFF cabling with optional drive cage ...
Страница 83: ...Cabling 83 LFF hard drive cabling Optical drive cabling ...
Страница 84: ...Cabling 84 FBWC cabling 8 or 16 drive SFF 8 drive LFF PCIe option ...
Страница 120: ...Technical support 120 ...
Страница 121: ...Technical support 121 ...