Hardware options installation 66
•
12 drive LFF
•
25 drive SFF
1.
Install the access panel (on page
25
).
2.
Install the server into the rack ("
Installing the server into the rack
" on page
40
).
3.
Connect each power cord to the server.
4.
Connect each power cord to the power source.
5.
Power up the server (on page
23
).
Optical drive option
1.
Power down the server (on page
23
).
2.
Remove all power:
a.
Disconnect each power cord from the power source.
Содержание ProLiant DL385p
Страница 51: ...Hardware options installation 51 19 Install the air baffle 20 Install the primary PCIe riser cage ...
Страница 65: ...Hardware options installation 65 o 8 or 16 drive SFF o 8 drive LFF ...
Страница 90: ...Cabling 90 Cabling SAS hard drive cabling SFF hard drive cabling SFF cabling with optional drive cage ...
Страница 91: ...Cabling 91 LFF hard drive cabling Optical drive cabling ...
Страница 92: ...Cabling 92 FBWC cabling 8 or 16 drive SFF 8 drive LFF ...
Страница 132: ...Support and other resources 132 ...
Страница 133: ...Support and other resources 133 ...