Setup 33
o
Link/Act LED on the switch network port that is being used—Initially, solid green to indicate
successful connection, and then flashing green to indicate active communication with the network.
o
Fault LED—Remains off to indicate successful Self-Test completion.
For more information on the location of the switch LEDs and their behavior during the Self-Test process,
see the switch documentation.
Completing the switch setup
After the Ethernet cable connection is made, check the network LED status on both the server and the switch
to confirm successful connection:
•
In the server front panel, the NIC status LED
—Solid green
•
In the switch, the Link/Act LED on the network connector used—Initially, solid green to indicate
successful connection, and then flashing green to indicate active communication with the network.
Содержание ProLiant DL320e Gen8 v2
Страница 65: ...Cabling 65 Front I O board cabling ...
Страница 94: ...Support and other resources 94 ...
Страница 95: ...Support and other resources 95 ...