Hardware options installation 32
4.
Determine the status of the drive from the LEDs ("
Storage controller/NVMe pass-through board
options
To install the component:
1.
Back up all server blade data.
2.
Power down the server blade (on page
3.
Remove the server blade (on page
4.
Place the server blade on a flat, level work surface.
5.
Remove the access panel (on page
6.
Prepare the storage controller/NVMe pass-through board for installation.
7.
Align the storage controller/NVMe pass-through board with the alignment pins and lower it into
server blade.