Hardware options installation
61
1. Determine the status of the hard drive from the hot-plug hard drive LEDs
("Hot-plug SCSI hard drive LED combinations" on page
23
, "Hot-plug SCSI
hard drive LEDs" on page
22
).
2. Back up all server data on the hard drive.
3. Remove the hard drive.
Installing a hot-plug SCSI hard drive
1. Remove the existing hard drive blank or hard drive from the drive bay.
Содержание ML370 - ProLiant - G3
Страница 8: ......
Страница 47: ...Server setup 47 7 Secure the server to the rack 8 Secure the cable management arm bracket to the server ...
Страница 52: ......
Страница 85: ...Hardware options installation 85 2 Release the retaining clip 3 Install the expansion board ...
Страница 110: ......
Страница 130: ......
Страница 138: ...138 HP ProLiant ML370 Generation 4 Server Reference and Troubleshooting Guide ...
Страница 140: ...140 HP ProLiant ML370 Generation 4 Server Reference and Troubleshooting Guide ...
Страница 143: ...Troubleshooting 143 ...
Страница 145: ...Troubleshooting 145 ...
Страница 147: ...Troubleshooting 147 ...
Страница 150: ...150 HP ProLiant ML370 Generation 4 Server Reference and Troubleshooting Guide ...
Страница 292: ......