Replacing the MegaRAID iTBBU02 Battery
CA293-04780
rev 00
page 7 of 10
22.
Verify that the cage rails are aligned with the chassis guides.
Figure 7 Remounting the PCI riser cage in the server chassis
2
1
1
PCI riser cage rails
2 Chassis
guides
23.
Secure the PCI riser cage with the securing screws.
24.
Press the four blue screw covers to lock them.
25.
Reconnect the RAID cable to the PCI riser cage.
26.
Reconnect the network cables.
27.
Replace the top cover.
28.
Reconnect the power cables.
29.
Push the server back into its normal position in the rack.
30.
Store the server mounting screws in a secure location at the customer site. The server
mounting screws can be reused if the customer needs to move the system.
31.
Ask the customer to dispose of the old battery according to local environmental regulations.