36
2.
Remove the screws on the protective cover with a screw driver to remove the protective cover,
as shown in the following figure:
Figure 48 Removing the sticky label and protective cover
3.
Insert one end of the RPS power cord to the RPS receptacle on the router and fasten the
screws on the RPS power cord plug.
4.
Make sure the RPS power is OFF and connect the other end of the power cord to the RPS
power source.
Figure 49 Connecting the RPS power cord
Verifying the installation
After you complete the installation, verify the following information:
•
There is enough space for heat dissipation around the router, and the rack or workbench is
stable.
•
USB devices and interface modules are properly installed.
•
The router, rack, and power cords are reliably grounded.
•
The correct power source is used.
Powering on the router
Verifying before power-on
Before powering on the router, verify the following items:
•
The power supplies are correctly installed.
•
The power cord and grounding cable are properly connected.
Содержание FlexNetwork MSR3012
Страница 5: ...iii Index 80 ...
Страница 25: ...20 Figure 22 Grounding the router through the grounding terminal on the rack ...
Страница 48: ...43 Figure 57 MSR3024 internal module locations 1 Front panel 2 Rear panel 3 VPM 4 Memory module ...
Страница 49: ...44 Figure 58 MSR3044 internal module locations 1 Front panel 2 Rear panel 3 VPMs 4 Memory module ...