Standard Operation Procedure
Document No.
Connery/Travolta 14” & 15” LCM DIS ASS’Y SOP
Station :
Name
: Ver. :
Date
:
Step
:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator
:
Issue department
:
Vick Weng
NPSU-PPE
Auditor
:
C.S. Lee
Disassemble Camera or MIC/B
1. Rip the AL foil that is on camera or MIC/B.
(Fig.1)
2. Rip the acid tape that is on LVDS cable.
(Fig.2)
3. Disassemble camera or MIC/B from rear
cover, and disconnect LVDS cable. (Fig.3 /
Fig.4)
4. Disassemble LVDS cable from rear cover.
(Fig.5)
Fig.2
Fig.3
4(1/1)
Fig.1
2016/10/26
0.1
Fig.1
Fig.4
Fig.5