Standard Operation Procedure
Document No.
Connery Travolta 14” & 15” FA DIS ASS’Y SOP
Station :
Name
: Ver. :
Date
:
Step
:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator
:
Issue department
:
Vick Weng
NPSU-PPE
Auditor
:
C.S. Lee
25(2/2)
Loosen M/B Screws
Electric cross screwdriver (#1)
1
1. Loosen M/B screw *2. (Fig.1 / Fig.2)
Fig.1
Fig.2
14”
15”
0.1
2016/10/26