Standard Operation Procedure
Document No.
Connery Travolta 14” & 15” FA DIS ASS’Y SOP
Station :
Name
: Ver. :
Date
:
Step
:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator
:
Issue department
:
Vick Weng
NPSU-PPE
Auditor
:
C.S. Lee
Disassemble Thermal Module & Fan
28(2/2)
1. Put the M/B on support fixture. (Fig.1)
2. Loosen thermal module set screw.
UMA : screw * 4. (Fig.2)
DIS : screw * 6. (Fig.3)
Fig.2
Electric cross screwdriver (#1)
1
M/B Support Fixture (B-Side) 1
Fig.1
DIS
1
2
3
4
5
6
UMA
1
2
3
4
0.1
2016/10/26
Fig.3