230 END
Test 4-4: Resistance Test (4-Wire Ohms)
This test verifies the 4-wire resistance accuracy of the 2k
Ω
, 100k
Ω
, and
1M
Ω
ranges.
NOTE
The DC Voltage performance test must be performed prior to the Resistance
Test to check the A/D accuracy on all ranges. If the DC Voltage test has not
been performed, resistance must be checked on all ranges at 0 and at 50%
of full scale.
Equipment Setup
1.
Connect the equipment as shown in Figure 4-4
2.
Set the HP E1411 multimeter as follows:
•
Reset Multimeter ..................................................*RST
•
Auto Zero ..................................................................ON
•
Power Line Cycles (PLC) .............................................1
Figure 4-4. Resistance Test Setup
Chapter 4
Verification Tests 29
Содержание E1411A
Страница 4: ...Notes ...
Страница 8: ...Notes 8 HP E1411A B Service Manual ...
Страница 10: ...10 HP E1411A E1411B Service Manual ...
Страница 36: ...Notes 36 Verification Tests Chapter 4 ...
Страница 48: ...Notes 48 Adjustments Chapter 5 ...
Страница 51: ...Figure 6 1 HP E1411A Replaceable Parts Chapter 6 Replaceable Parts 51 ...
Страница 53: ...Figure 6 2 HP E1411B Replaceable Parts Chapter 6 Replaceable Parts 53 ...
Страница 56: ...56 Manual Changes Chapter 7 ...