
72
Library operation
Power distribution unit
and
show and describe the function of the control and indicators located on the
power distribution unit and the attached extension bars (power strips).
Figure 51
Power distribution unit controls and indicator
Powering off the library
1.
Verify that all jobs have completed processing.
2.
Using the OCP, select
Operations > Media operations > Unlock Door
. The robot is parked.
3.
Open the back doors of the library rack.
4.
Press the main power switch (
on page 69) to the O (Off) position.
Table 15
Power distribution unit controls and indicator
Index
No.
Control/indicator
Function
1
Power LED
When lit (red), shows power is applied to the unit.
When not lit, indicates the PDU is not receiving power.
2
PDU Switch 1
When switched On, applies power to power strip 1.
3
PDU Switch 2
When switched On, applies power to power strip 2.
4
Power strip power switch
When set to I (On), applies power to the power strip. When set to
O (Off), removes power from the power strip.
10451
2
10
1
10
1
2
3
4
Содержание AD560-96002
Страница 16: ...16 Library overview Figure 3 Example of a fully expanded Enterprise Modular Library E Series 10449 3 ...
Страница 46: ...46 Installing the Library ...
Страница 52: ...52 Preparation for use ...
Страница 96: ...96 Maintenance ...
Страница 100: ...100 Moving the library ...
Страница 128: ...128 Installing a redundant PDU ...