
Installing the System
Unpacking and Inspecting the Server
Chapter 1
24
Step 3.
Break off any foam packaging which could prevent the lifter from being fully inserted under the
server. Do not remove the foam packaging from the corners of the server. This foam is required to
elevate the server and enable the forks of the lifter to be placed under the server.
Step 4.
Insert the lifter forks under the server.
Step 5.
Carefully roll the lifters forward until it is fully against the side of the server.
Step 6.
Slowly raise the server off the pallet until it clears the pallet cushions.
Step 7.
Carefully roll the lifter and server away from the pallet. Do not raise the server any higher than
necessary when moving it over to the rack.
Содержание 9000 rp3410
Страница 6: ...Tables 6 ...
Страница 15: ...Installing the System Introduction Chapter 1 15 Figure 1 4 HP 9000 rp3410 rp3440 Server Pedestal Mount ...
Страница 62: ...Installing the System Installing Additional Components Chapter 1 62 Figure 1 50 Connecting the Power Pod Cable ...
Страница 94: ...Installing the System Troubleshooting Chapter 1 94 ...