6
Figure 1
Hardware installation flow
Ground the switch
Install the switch
Start
Connect power cords
Verify the installation
Power on the switch
Select and install power
supplies
Hot-swap power
supplies?
Yes
No
Operating correctly?
Power off the switch
Troubleshoot the
switch
No
Yes
Hot-swap cards?
Install PoE modules
Install interface cards
Install OAP cards
Select cards
Yes
Operating correctly?
Troubleshoot the
switch
Verify card installation
Yes
No
End
No
Hot-swap
fan trays?
Select and install fan
trays
Yes
No
Fan trays installed?
No
Yes