![Hoymiles HYT-10.0HV-EUG1 Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/hoymiles/hyt-10-0hv-eug1/hyt-10-0hv-eug1_user-manual_2171468012.webp)
Hybrid Inverter User Manual
© 2022 Hoymiles Power Electronics Inc. All rights reserved.
11
• This diagram is an example for an application in which neutral is separated
from the PE in the distribution box.
• For countries such as China, Germany, Italy, etc., please follow local wiring
regulations!
• The back-up PE line and earthing bar must be grounded properly and
effectively. Otherwise, the back-up function may be abnormal when the
grid fails.
Model
①
②
③
④
⑤
⑥⑦
HYT-5.0HV-EUG1
25A/600V
DC Breaker
16A/230V
AC Breake
r
20A/230V
AC Breaker
Depends on
Loads
Main
Breaker
30mA RCD
HYT-6.0HV-EUG1
25A/600V
DC Breaker
16A/230V
AC Breaker
25A/230V
AC Breaker
HYT-8.0HV-EUG1
25A/600V
DC Breake
r
20A/230V
AC Breaker
32A/230V
AC Breaker
HYT-10.0HV-EUG1
40A/600V
DC Breake
r
25A/230V
AC Breaker
32A/230V
AC Breaker
HYT-12.0HV-EUG1
40A/600V
DC Breaker
25A/230V
AC Breaker
32A/230V
AC Breaker
NOTICE
Note:
If battery integrates a readily accessible internal DC breaker, no additional
①
DC breaker is required.
⑥⑦
30mA RCD is recommended not mandatory, please comply with local regulation, please comply with local regulation.
B. Diagram for Other Countries
E-BAR
HYT-HV Series
Battery
BMS
Backup
Loads
Smart
Meter
PV
RCD
Grid
Normal Loads
Distribution Box
PE
or
L1
L2
L3
N
L1
L2
L3
N
PE
EPS
GRID
Meter
L1
L2
L3
N
PE
L1
L2
L3
N
PE
L1 L2 L3 N
PE
CT1
CT2
CT3
Utility
meter
RCD
LOAD
GRID