![Howe Rapid Freeze Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/howe/rapid-freeze/rapid-freeze_service-manual_2171308014.webp)
3 Installing the Rapid Freeze Flaker
8
REFRIGERANT CHARGING
Special Precautions To Be Observed When Charging Refrigeration Systems
Only technically-qualified persons, trained and certified in the handling of refrigerant and operation of
refrigeration systems, should perform the operations described in this manual.
If a refrigeration system is being charged from refrigerant cylinders, disconnect each cylinder when empty or
when system is fully charged. A gauge should be installed in the charging line to indicate the refrigerant
cylinder pressure. The cylinder may be considered empty of liquid R-22 refrigerant when the gauge pressure
is 25 psi or less, and there is no frost on the cylinder. Close the refrigerant charging valve and cylinder valve
before disconnecting the cylinder. Loosen the union in the refrigerant line, SLOWLY and CAREFULLY, to
relieve refrigerant pressure in the charging hose.
*** WARNING ***
Never open charging valve allowing refrigerant to vent directly to atmosphere.
Refrigerant must be reclaimed through a recovery system.
*** WARNING ***
Always store cylinders containing refrigerant in a cool place. They should never be exposed to temperatures
higher than 125
°
F (52
°
C) and should be stored and secured in a manor to prevent abnormal mechanical
shocks.
*** CAUTION ***
Service/Installation personnel MUST have knowledge of refrigeration systems
to properly charge this ice flaker.
*** CAUTION ***
Verify that thermostatic expansion valve supplied with the ice flaker matches the refrigerant for the
refrigeration system or condensing unit.
*** WARNING ***
All Rapid Freeze BARE and Remote model ice flakers are shipped with a small holding
charge of dry Nitrogen.
SYSTEM MUST BE EVACUATED PRIOR TO CHARGING REFRIGERANT.
*** WARNING ***
Содержание Rapid Freeze
Страница 6: ......
Страница 16: ...6 SEAWATER MODEL INSTALLATION 10 ASSEMBLY DRAWING 11ESS 21ESS...
Страница 17: ...6 SEAWATER MODEL INSTALLATION 11 ASSEMBLY DRAWING 31ES 31ESS...
Страница 18: ...6 SEAWATER MODEL INSTALLATION 12 ASSEMBLY DRAWING 51ES 51ESS...
Страница 19: ...6 SEAWATER MODEL INSTALLATION 13 ASSEMBLY DRAWING 11EFS 21EFS...
Страница 20: ...6 SEAWATER MODEL INSTALLATION 14 ASSEMBLY DRAWING 51EFS...
Страница 21: ...6 SEAWATER MODEL INSTALLATION 15 ASSEMBLY DRAWING 10ESS 20ESS...
Страница 22: ...6 SEAWATER MODEL INSTALLATION 16 ASSEMBLY DRAWING 30ES 30ESS...
Страница 23: ...6 SEAWATER MODEL INSTALLATION 17 ASSEMBLY DRAWING 50ES 50ESS...
Страница 28: ...9 How The Rapid Freeze Flaker Operates 22 ICE FLAKER CUTAWAY DRAWING EXHIBIT 26...
Страница 38: ...12 Control Panel Wiring Diagrams 32 Control Panel Schematic E20T40 RL...
Страница 39: ...12 Control Panel Wiring Diagrams 33 460 3 60 WIRING E20T47...
Страница 40: ...12 Control Panel Wiring Diagrams 34 460 3 60 Control Panel Schematic E50U8 RL Large Capacity Single Circuit...
Страница 41: ...12 Control Panel Wiring Diagrams 35 460 3 60 Control Panel Schematic E50U9 RL Large Capacity Dual Circuit...
Страница 42: ...12 Control Panel Wiring Diagrams 36 220 1 50 Control Panel Schematic E20T40 RL 50...
Страница 43: ...12 Control Panel Wiring Diagrams 37 380 3 50 Control Panel Schematic E20T60...
Страница 44: ...12 Control Panel Wiring Diagrams 38 380 3 50 Control Panel Schematic E50U14 RL Large Capacity Single Circuit...
Страница 64: ...15 Service Adjustment 58 EXHIBIT 40...
Страница 75: ...SELECTIVE PURPOSE Manual Page 69...