8
Field
Installation
Field
Installation
Safety
Information
and
Guidelines
Only
qualified
service
technicians
should
attempt
to
install,
service,
or
maintain
the
Ice
Flaker.
Make
sure
all
power
sources
are
disconnected
before
any
service
work
is
done
to
the
Ice
Flaker.
All
field
wiring
must
conform
to
the
requirements
of
the
equipment
and
all
applicable
local
codes
and
national
codes.
Always
refer
to
the
Condensing
Unit
manufacturer’s
installation
manual
for
further
specification
and
guidance.
Inspection
Upon
receipt,
check
all
items
against
the
bill
of
lading
to
make
sure
all
crates
and
cartons
are
accounted
for.
Any
shortage
or
damages
should
be
reported
to
the
delivering
carrier.
Damaged
material
becomes
the
delivering
carrier’s
responsibility
and
should
not
be
returned
to
the
manufacturer
unless
prior
approval
is
given.
Take
care
not
to
damage
equipment
when
uncrating.
Condensing
Unit
Rigging
and
Mounting
Rigging
holes
are
provided
on
all
units.
Caution
should
be
exercised
when
moving
these
units.
To
prevent
damage
to
the
unit
housing
during
rigging,
cables
or
chains
used
must
be
held
apart
by
spacer
bars.
The
mounting
platform
or
base
should
be
level
and
located
so
as
to
permit
free
access
of
supply
air.
Ground
Mounting
Concrete
slab
raised
six
inches
above
ground
level
provides
a
suitable
base.
Raising
the
base
above
ground
level
provides
some
protection
from
ground
water
and
wind
‐
blown
matter.
Before
tightening
mounting
bolts,
recheck
level
of
unit.
The
unit
should
in
all
cases
be
located
with
a
clear
space
in
all
directions
that
is
at
a
minimum,
equal
to
the
height
of
the
unit
above
the
mounting
surface.
A
condensing
unit
mounted
in
a
corner
formed
by
two
walls,
may
result
in
discharge
air
recirculation
with
resulting
loss
of
capacity.
Roof
Mounting
Due
to
the
weight
of
the
units,
a
structural
analysis
by
a
qualified
engineer
may
be
required
before
mounting.
Roof
mounted
units
should
be
installed
level
on
steel
channels
or
an
I
‐
beam
frame
capable
of
supporting
the
weight
of
the
unit.
Access
Provide
adequate
space
at
the
compressor
end
of
the
unit
for
servicing.
Provide
adequate
space
on
the
connection
side
to
permit
service
of
components.
Содержание 1000-RLE
Страница 6: ...6 Engineering Guidelines Figure 1 ...
Страница 40: ...40 Appendix Appendix Cut View 1000 RLE ...
Страница 41: ...Appendix 41 Cut View 2000 RLE 3000 RLE ...
Страница 42: ...42 Appendix Assembly Drawing 1000 RLE Ice Flaker CP750 Mobile Express Ice Bin ...
Страница 43: ...Appendix 43 Assembly Drawing 2000 RLE Ice Flaker CP1500 Mobile Express Ice Bin ...
Страница 44: ...44 Appendix Assembly Drawing 3000 RLE Ice Flaker CP2500 Mobile Express Ice Bin ...
Страница 45: ...Appendix 45 Wiring Diagram Ice Flaker ...
Страница 46: ...46 Appendix Wiring Diagram 230 3 60 Air Cooled Condensing Unit supplied by Howe Corporation ...
Страница 47: ...Installation Service Manual For Use with Remote Single Condensing Unit RLE Rev Date 08 2014 ...
Страница 48: ...Parts List 1000 RLE Non Replaceable Parts Item No Description Part No ...
Страница 51: ...Parts List 2000 RLE 3000 RLE ...