Commissioning
5.2 Filling the heating system
Filling of the heating system must be carried out by
trained personnel. The filling and replacement water
must comply with the quality requirements in the
relevant state or country (VDI 2035 or SWKI 88-4 or
ÖNORM H 5195).
5.3 Filling the calorifier (if present)
The heating boiler may be put into operation even
when the calorifier is not filled.
5.4 Commissioning
Important:
On first commissioning, check that all safety and control
devices are functioning properly (in accordance with
the operating manual).
The operation and maintenance of the system must
be explained to the user in detail.
In some areas, gas or dual-fuel
systems may only be commissioned by
an engineer from the local gasworks.
Check with the local gasworks to
make sure.
5.5 Oil/gas burner
Setting the burner must also be carried out by
a specialist, and the setting must correspond to the
heat demand of the system.
Please see the technical information / assembly
instructions supplied with the burner.
5.6 Handover to the operator / storage
Have the operator confirm in writing that the
operating and maintenance procedures have been
explained and that he or she has received a copy
of the relevant operating manuals. (See sample on
page 38). The manufacturer of the unit is responsible
for providing operating manuals for the complete
system. This technical information / these installation
instructions must not be destroyed after completing the
commissioning procedures, but should be permanently
stored with the unit.