26
4 219 316 / 00
InSTaLLaTIOn
3.3.6 Design examples for
room air independent operation
9
6
8
5
Falls erforderlich ist
ein Inspektions-T-
Stück einzusetzen
7
2
4
3
Verbrennungs-
luft
1
TopGas
®
If necessary, insert an
inspection T-piece
Combustion air
Example TG K1 C80/125 PP
1 Inspection T-piece with measure opening C80/125 PP
2 Length adjustment piece C80/125 L = 315-440 mm
3 Duct C80/125 wall plate with connecting sleeve 220 x 220 mm
and casing tube Ø 150 mm, L = 300 mm
4 Length element E80 L = 450 mm PP
5
Bearing rail E flue gas pipe support in shaft
6
Support arch E80 - 90° PP
7
Distance holder E80 set (2 pieces) of polypropylene
for centring tube in shaft; 3 sets
8 End tube E80 L = 500 mm to top part E80, stainless steel
9
Top part E80 for chimney end for back ventilation
with shaft cover 400 x 400 mm, clamp tape and seal ring
TopGas
®
classic (35,45)
Assembly kit
TG K1 C80/125 PP
TG K1 C80/125 Flex PP
0
5
10
15
20
25
0
1
2
3
4
5
6
Anbindeleitung [m]
Höhe [m
]
TopGas
®
classic (35)
TopGas
®
classic (45)
Maximum horizontal length connecting pipe (m)
Maximum
effective
height
flue
gas
pipe
(m)
TopGas
®
classic (35,45)
Assembly kit TG K2 C100/150 PP-A
Assembly kit TG K2 C100/150 Flex PP-A
0
5
10
15
20
25
0
1
2
3
4
5
6
Anbindeleitung [m]
Höhe [m]
Maximum horizontal length connecting pipe (m)
Maximum
effective
height
flue
gas
pipe
(m)
TopGas
®
classic (50,60)
Assembly kit TG K2 C100/150 PP-A
Assembly kit TG K2 C100/150 Flex PP-A
0
5
10
15
20
25
0
1
2
3
4
5
6
Anbindeleitung [m]
Höhe [m]
Maximum horizontal length connecting pipe (m)
Maximum
effective
height
flue
gas
pipe
(m)
Содержание TopGas classic 100
Страница 46: ...46 4 219 316 00...
Страница 47: ...47 4 219 316 00...