background image

40

Hoval STU Wood Pellet Boiler

Appendix C - Boiler Familiarisation Information

Water dump Container

Water dump thermal 

valve

Clamp on burnback 

thermostat.

Sleeve for water dump 

thermal valve sensor.

Important:

 

The 

sensor must be 

located in this sleeve 

to ensure correct 

operation of the wa-

ter dump device

Removable cap

Water dump container

Boiler drain connection (two 

per boiler)

Water dump thermal valve 

preset to open at 95 °C

Thermal valve test 

button (red)

Note: Water dump container 

and thermal valve should be 

removed from the delivery 

auger tube and held over a 

suitable container  before 

testing. Please ensure the 

container is refilled with 

water as per page 41.

STU Boiler

Содержание STU Series

Страница 1: ...Installation Operation and Maintenance Instructions STU wood pellet fired hot water boiler 150 1000kW STUman May 2010 WS2...

Страница 2: ...n Guidelines Entry to fuel Store 17 18 Typical Plantroom Layouts 19 21 Boiler Door Handing 22 Boilerhouse Ventilation Open Vented Pressurised Systems 23 Flues and Chimneys 24 Filling The System With W...

Страница 3: ...technical servicing or parts enquiries telephone fax or e mail Hoval quoting the boiler s serial number as above Tel 01636 593413 or 593435 Fax 01636 673532 e mail service hoval co uk or spares hoval...

Страница 4: ...n and use of this appliance Fuel Quality Requirement The design of the boiler stoker pellet handling system and store is dependant on using the correct quality wood pellet fuel The pellets should be f...

Страница 5: ...uel bed An optional ignition start system is available on request but this must be specified at the time of order The boiler comprises of a welded steel shell with a water jacket surrounding an oval c...

Страница 6: ...of flue gases ensures close combustion control as the air supply is adjusted to match the fuel feed The standard stoker design incorporates an airless kindle feature This allows the boiler under norm...

Страница 7: ...28 5 87 6 11 Water Flow Rate 82 71 C kg s 3 4 4 3 5 4 6 5 8 2 9 2 10 9 13 0 17 4 21 7 Hydraulic Resistance at 80 60 C kPa 0 2 0 3 0 4 0 6 0 6 0 8 1 1 1 6 1 8 1 9 Water Flow Rate 80 60 C kg s 1 9 2 4...

Страница 8: ...40 235 235 235 235 235 235 275 Connections 1 Flow PN6 DN50 DN80 DN80 DN80 DN80 DN80 DN80 DN100 2 Return PN6 2xDN50 2xDN80 2xDN80 2xDN80 2xDN80 2xDN80 2xDN80 2xDN100 3 Safety valve BSP G1 1 2 G2 G2 G2...

Страница 9: ...peration Connections 800 1000 1 Flow PN6 DN125 DN150 2 Return PN6 2xDN125 2xDN150 3 Safety valve BSP G2 G2 4 Drain BSP 2xG1 1 2 2xG1 1 2 5 Stat pockets BSP 2xG1 2 2xG1 2 6 Pressure switch BSP R3 4 R3...

Страница 10: ...he boiler to suit specific plant room layout See Page 11 for a typical plant room layout Cyclone 800 1000 A mm 1389 1439 B mm 744 768 C mm 2368 1540 D mm 2227 2422 E mm 2615 2872 F mm 900 950 G mm 274...

Страница 11: ...mensions and Technical Information Typical Layout Hoval STU Boiler with modular twin cyclone floor mounted ID fan and connecting ductwork Hatched ducting NOT by Hoval To suit specific plant room layou...

Страница 12: ...iltration in use The elements are easily replaced by vertically removing the existing elements from the unit and replacing with a new element Accordingly it is essential to locate the filter with a mi...

Страница 13: ...ught Fan Incoming Electrical Supply Type Motor kW Absorbed power kW STU 150 CF 150 Halifax 1 5 0 89 3N 50Hz 400 230V 10A max STU 200 CF 200 Halifax 1 5 0 86 3N 50Hz 400 230V 10A max STU 250 CF 250 Hal...

Страница 14: ...CF Biomass Filter Typical units 14 Measurements in mm CF 500 unit Clearance of 1000mm required above the unit for filter withdrawal replacement...

Страница 15: ...spection lids Cladding and Lagging 75mm thk Control panel RCA 25 DD pulse valve Compressed air reservoir Particulate discharge tray Clearance of 1000mm required above the unit for filter withdrawal re...

Страница 16: ...outlet Outlet Outlet Fluing to chimney Typical Layout STU 200 Wood Pellet Boiler with CF 200 Biomass Filter Hatched ducting not by Hoval Note easy radius bends should be used 16 Side Elevation View o...

Страница 17: ...ke build bunker store These typically require a larger floor area and are less effective in terms of the available recoverable volume of fuel Some profiling of the bunker base should be considered min...

Страница 18: ...l consumption would be estimated based on the loading placed on the boiler Wood Pellet fuel store to be sized to accommodate a minimum of 10 15 days anticipated fuel use 3 Delivery Size The fuel suppl...

Страница 19: ...s of dead volume b Slots active pick up locations c Gate valve required to isolate individual silos 2 STU wood pellet boiler 3a Flexible auger Note requirements for long radius bends 1 5 2m Note maxim...

Страница 20: ...20 Hoval STU Wood Pellet Boiler Typical Plantroom layouts GENERAL ARRANGEMENT OF A STOKER AND A FABRIC SILO GENERAL ARRANGEMENT OF STU BOILER WITH TWIN EB BOOT TABLES AND PROFILING...

Страница 21: ...21 Hoval STU Wood Pellet Boiler Typical Plantroom layouts GENERAL ARRANGEMENT OF STU BOILER AND A FABRIC TROUGH BUNKER INDICATIVE LAYOUT OF STU BOILER WITH GRP SILO...

Страница 22: ...lock nuts on the new hinge side are fully tightened 5 Loosen locknuts on the new opening side so that a seal is obtained all round the fibre joint Important Always have two nuts tightened to prevent t...

Страница 23: ...idelines The supply of air to a space housing the boiler by mechanical means should be mechanical inlet with natural or mechanical extraction Mechanical extract ventilation with natural inlet must not...

Страница 24: ...is particularly important on any horizontal section The flue should include some pressure relief and or draught stabiliser as Appropriate Flues should be supported independently to prevent any undue...

Страница 25: ...ains is treated Even the water in closed systems will promote corrosion unless treated For these reasons Hoval strongly recommend that when necessary the system be thoroughly cleaned prior to the use...

Страница 26: ...e starting the ignition process The Stoker Control Panel also houses a series of indicator lights as follows Panel Live Orange Fuse Failed Red Stoker Run Green High Limit Red Trip Red Under normal ope...

Страница 27: ...en stoker running but the error message will still be retained on the display until cleared by the operator This is accessed via the manual status menu as detailed on page 28 However it is important t...

Страница 28: ...eters and manually set plant status only Level 2 As Level 1 and change times schedules set points view menus Level 3 As Level 2 with change all settings and view all parameters Level 4 As Level 3 with...

Страница 29: ...using the controller The parameters shown here will be directly related to your plant applications and requested access levels to suit your experience These parameters may be changed by you e g if a s...

Страница 30: ...ndicated whether the Boiler Fan is called to run I On O Off Delayed FD Fan All Levels Indicates whether the Stoker Fan is called to run I On O Off Trickle Feed Rate Level 4 This sets the pellet feed t...

Страница 31: ...All other manufacturers equipment has been installed and commissioned e g pressurisation units A suitable safety valve has been fitted to the boiler together with associated discharge pipework Suffici...

Страница 32: ...ting The boiler will be left with water in the water dump device full to within 50mm of the top of the container The LRP boiler control thermostat is adjusted to suit the system design flow and temper...

Страница 33: ...t excessive manual input The stoker will automatically adjust the firing range to match the load with damper control on both the forced and induced draught fans Continuous O2 monitoring of the flue ga...

Страница 34: ...ition of the fire within the retort to ensure that combustion is fully established using the sight glass on the front of the door of the boiler IMPORTANT Once the fire has established the isolating sw...

Страница 35: ...D FAN only switch should be put to the ID fan only position to pull any residual fumes out of the boiler On the 600 1000kW boilers the boiler needs to be left to stand for 30 minutes The boiler door c...

Страница 36: ...correctly NOTE No continuous make up of water should be taking place In this event check where a leak may be occurring or if pumping over is taking place Maintenance Boiler and Stoker Servicing In ad...

Страница 37: ...so that the shear pin slot is at the top using the shear pin bar provided align the slot on the worm section remove broken pin and fit replacement If there is a jam or pin failure on the Pick Up Auge...

Страница 38: ...38 Hoval STU Wood Pellet Boiler GRP SILO SPECIFICATION SHEET 2 85m Appendix A...

Страница 39: ...39 Hoval STU Wood Pellet Boiler Appendix B Note The thermostatically operated valve has a red test button which will prove the valve opens when pressed held in...

Страница 40: ...this sleeve to ensure correct operation of the wa ter dump device Removable cap Water dump container Boiler drain connection two per boiler Water dump thermal valve preset to open at 95 C Thermal valv...

Страница 41: ...thermostat access cover Isolate the boiler control panel via the main isolator switch on the panel facia before removing this cover Remove cap and check the water level weekly Water should be within 5...

Страница 42: ...amiliarisation Information Pellet Drop box Proximity level switch in pellet delivery auger transfer box Access cover to delivery auger to drive coupling shear pin Stoker delivery auger to drive coupli...

Страница 43: ...nduced Draught Fan Actuator for Induced draught fan damper Smoke box condensate drain piperwork with trap Mains cold water supply Thermal valve preset to open at 95 C Cooling coil heat exchanger s con...

Страница 44: ...Combustion chamber pressure sensing point with interconnecting pipework to pressure switch Clean this out weekly Appendix C Boiler Familiarisation Information Forced draught fan with motorised damper...

Страница 45: ...oiler Familiarisation Information View of Combustion Chamber with pellets in the retort at the correct level for lighting Refractory fibre boiler door lining Cut out for sight glass opening Combustion...

Страница 46: ...hanger Appendix C Boiler Familiarisation Information Remove insulated red cover below boiler door and lift off metal in spection panel to gain access to the optional 3kW electric ignition unit located...

Страница 47: ...47 Hoval STU Wood Pellet Boiler Appendix C Boiler Familiarisation Information Optional 3kW electric ignition unit Lift off metal inspection panel...

Страница 48: ...tch the Wood burner to the Off position found on the KINDLE OFF AUTO selector switch mounted on the control panel 3 Turn the separate I D Fan selector switch to I D Fan Only 4 Take care when opening t...

Страница 49: ...sealed when refitted 8 Refit the spiral retarders 9 Clean the small hole for the combustion chamber pressure switch sensing point which is found on the L H S of the combustion chamber close to boiler...

Страница 50: ...k on 8 If the fire is not established allow more time before turning the Pick up and Conveyor augers back on NOTE For a boiler fitted with an ignition system the above procedure should only be employe...

Страница 51: ...rruption Burn back Fire has tracked back along the Thermostat initiation conveyor tube Possible causes are Conveyor motor tripped see below or shear pin failure burn back thermostat malfunction or a p...

Страница 52: ...52 Hoval STU Wood Pellet Boiler Notes...

Страница 53: ...53 Hoval STU Wood Pellet Boiler Notes...

Страница 54: ...thgate Newark Notts NG24 1JN Tel No s 01636 59413 or 593435 Service Desk direct dial numbers 01636 593412 Spares Desk direct dial Fax 01636 673532 e mail service hoval co uk spares hoval co uk STUman...

Отзывы: