32
Hoval STU Wood Pellet Boiler
Commissioning Report
•
The electrical installation with the appropriate wiring diagram for the boiler and stoker and for correct fan/motor
rotation.
• That the stoker has not been damaged since installation and that there is a suitable supply of fuel available on
site.
• All items packed in transit are removed from the combustion chamber.
• Boiler Safety features are installed correctly and operating. The boiler will be left with water in the water dump
device (full to within 50mm of the top of the container).
• The LRP boiler control thermostat is adjusted to suit the system design flow and temperature.
• The control and high limit thermostats are set in accordance with the LRP stoker control thermostat.
• The boiler safety valve is suitable for the system.
• All Controls are proved and stats are adjusted in line with the temperature indicated on the boiler thermometer.
• The boilers are fired at a rate to allow stoker combustion settings to be optimised along with visual inspection
of the installed chimney.
Commissioning