These instructions have been written to give a brief description of the
SR-plus hot water boilers
,
their
installation, commissioning, operation and subsequent maintenance.
The installation of boilers and their ancillary equipment is normally carried out by the Heating Engineer, and
for the purpose of this manual he / she is regarded as the installer, and, as such, it is his / her responsibility
to ensure that he / she has read and understood the contents of this manual before installing the boiler.
It is essential that each boiler has all services connected to it before commissioning.
A note should be entered below by the person responsible for the plant, giving the boiler model,
output, reference 'K' number, and burner reference number. These numbers are indicated on the
appropriate nameplates.
For completion by Plantroom Attendant
Boiler Model:
Burner Ref. No.
Output
(kW):
Fuel:
K No.
Commissioning Date
For technical, servicing or parts enquiries,
telephone, fax or e-mail to Hoval
quoting the boiler(s) serial number, as above
The installation should be in accordance with current
I.E.E. Regulations, relevant British Standard and Codes of
Practice, Building Regulations and Local Authority Bylaws.
Hoval Engineers will normally commission the boiler and
if the heating engineer is present at the time, he will be
instructed on the day-to-day operation of the boiler. If this
is not possible, or additional training is required, this can be
arranged through Hoval.
The boiler combustion figures are recorded on the commis-
sioning report and a copy of this will be issued for retention
with this manual (see example).
Commissioning/Combustion Report