7.5 Installing the air intake/flue gas system
■
Connect the loosely supplied parts of the air intake/flue gas pipe to each other
(slip-on coupling with locking band and seal):
■
Screw the spacer to the fastening bracket.
–
M6x20 screws with lock washers (2 ×)
■
Screw the fastening bracket to the roof unit.
–
M6x20 screws (3 ×)
■
Mount the air intake/flue gas pipe on the pre-installed first pipe section.
■
Secure the air intake/flue gas pipe to the roof unit with the spacer.
3
4
5
2
1
■
1
Extension with sampling points
■
2
Extension
■
3
Terminal
■
4
Fastening bracket
■
5
Spacer
Fig. 24:
Fastening the air intake/flue gas pipe
28
RoofVent
®
KG
Operating instructions
Transport and installation
4 220 755-en-00