7 Installation
When installing the HotSpot Titanium, the
following must be complied with:
• Install the boiler according to the installa-
tion manual supplied with the boiler;
• Water pressure: 1 - 5 bar;
• Maximum hot water temperature: 80 ºC
• When the water supply pressure exceeds
5 bar, a pressure reducing device is re-
commended to ensure proper operation;
1.
Drill a hole (maximum Ø 35 mm) into the
work top at the desired location.
2.
Slide the tap with the hose through the
worktop from top to bottom. The O-ring
must be installed between the working top
and the tap.
3.
Screw the two separate threaded ends into
the tap housing from below. The flat seat is
optional.
4.
Slide the U-shaped rubber packing and
flat steel plate together with the nut over
the threaded ends;
Fig. 7.2 Attaching hose to 3-in-1 tap
Fig. 7.3 Attaching retaining clip
9.
Connect the wire from the HotSpot Tita-
nium 3-in-1 tap to the connector at the
rear of the boiler (hook downwards)
(see
fig 7.4).
Fig. 7.4 Connecting wire to boiler connector
Refer to the HotSpot Titanium boiler instal-
lation and user manual for further details.
5.
Place the nuts over the threaded ends
and turn them tight under the worktop;
6.
Connect the hot and cold water hoses,
recognisable by the colour coding, to
the mains system. Optionally, the hot
water connection may be connected to
the hot water hose of the combi boiler.
Then remove the cap from the red hot
water hose with the proper tool;
7.
Slide the connector on the red hose that
comes from the boiler, over the 3-in-1 tap
connection until it can go no further;
8.
Secure the connector with the metal retaining
clip supplied with the boiler.
Note:
the clip should
neatly click around the connection housing.
Make sure the connection has been made
properly by pulling carefully on the hose;
Fig. 7.1 Fastening tap to work top
6