![Hot Wheels B610S Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/hot-wheels/b610s/b610s_instruction-manual_2165778005.webp)
A.
A
A.
B
A.
F
A.
C
A.
D
D
A.
E
CORKSCREW
CURVE
ASSEMBLY
Now let’s assemble the corkscrew curve section. The fol-
lowing drawings show you, step by step, how to assemble
this section.
Take your time, and refer to the Layout
Drawings on the Assembly Map if you need to.
You
Are
Here
3 x GUARDRAILS
2 x 12" RADIUS 1/8
J
1 x 9" RADIUS CURVE
8 x 9" RADIUS BANK
TRACK
H
2 x #4 SUPPORTS
4
1 x #5 SUPPORT
5
1 x #6 SUPPORT
6
1 x 15" STRAIGHT
C
1 x 6" STRAIGHT
1 x #2 SUPPORTS
2
These are the pieces you’ll need to assemble this section.
a
b
H
H
H
H
H
H
H
H
C
J
F
J
D
Assemble the track pieces as shown.
Add 3 guardrails as shown. To attach a guardrail:
gently flex the guardrail before attaching it.
Carefully attach the bottom of the guardrail first.
Then pull up and snap into place. Don’t force
guardrails into place.
e
Add 1 guardrail as shown. To attach a guardrail: gently
flex the guardrail before attaching it. Carefully attach
the bottom of the guardrail first. Then pull up and snap
into place. Don’t force guardrails into place.
T
B
J
Now attach the Cliff Hangers
®
section to the loop section,
and set the assembled track aside. Let’s go on to the
corkscrew curve section.
This elevated track section uses several supports.
Attach them as shown. To assemble a track sup-
port, separate the pieces as shown and snap off
the connector tabs (discard the tabs). Next, fit the
two pieces together as shown. Insert the assem-
bled track support into the round hole on the
underside of the track as shown.
Now attach the corkscrew curve section to the
Cliff Hangers
®
section, and set the assembled track aside.
Let’s go on to the terminal track section.
c
4
6
2
4
5
1
B1964-0920G1 DAREDEVIL CHALLENG 2/21/03 9:55 AM Page 5