5) Disconnect the gauge manifold hose from the vacuum pump and attach it to a
refrigerant service cylinder. Remember to loosen the connection and purge the air from
the hose. See the nameplate for the required refrigerant charge. Hoshizaki recommends
only virgin refrigerant or reclaimed refrigerant which meets ARI Standard 700 (latest
edition) be used.
6) A liquid charge is required when charging an R-404A system (to prevent fractionation)
and optional when charging an R-134a system. Place the service cylinder on the
scales; if the service cylinder is not equipped with a dip tube, invert the service cylinder,
then place it on the scales. Open the high-side valve on the gauge manifold.
7) Allow the system to charge with liquid until the proper charge weight is met.
8) If necessary, add any remaining charge to the system through the low-side.
NOTICE! To prevent compressor damage, use a throttling valve or liquid
dispensing device to add the remaining liquid charge through the low-side
access valve with the appliance running.
9) Close gauge manifold valves and disconnect the hoses.
10) Cap the access valves to prevent a possible leak.
Содержание AMERICA 73183
Страница 22: ...22 B Wiring Diagrams 1 CR1B FG High Pressure Switch Cut out 270 10 PSIG Cut in 190 20 PSIG...
Страница 23: ...23 High Pressure Switch Cut out 270 10 PSIG Cut in 190 20 PSIG 2 CR1B FS HS CR3B FS HS...
Страница 24: ...24 3 CR2B FG High Pressure Switch Cut out 270 10 PSIG Cut in 190 20 PSIG...
Страница 25: ...25 4 CR2B FS HS CR3B FS HS High Pressure Switch Cut out 270 10 PSIG Cut in 190 20 PSIG...