![Horizon Technology SPE-DEX 4790 Скачать руководство пользователя страница 41](http://html1.mh-extra.com/html/horizon-technology/spe-dex-4790/spe-dex-4790_service-manual_2163425041.webp)
40
9.
Rotate the valve bracket and remove the screws for the valve.
10.
Unscrew the vacuum supply from the top and side of the valve.
11.
Using the replacement valve supplied in the kit, attach the bottom vacuum line to the port on the
valve labeled NC.
12.
Attach the side vacuum line to the port labeled COMM.
13.
Using the removed screws, attach the replacement valve to the valve bracket.
14.
Plug the electrical pins into the Molex connector taking care to orient the pin such that the u-channel
aligns with the post inside the Molex connector. The pin will only fit in one direction.
15.
Attach both halves of the Molex connector together.
16.
Replace the bracket screw, but do not fully tighten. Tighten the 5/16” hexagonal nut while holding
the bracket to ensure that the bracket is in place. Tighten the bracket screw.
17.
Place the extractor cover on to the extractor, making sure that the front tabs are in place.
18.
Starting with the top middle hole, replace the screws, but so not fully tighten until all screws are in
place.
Press Here
to Unlock
4
3
2
1
8
7
6
5
Содержание SPE-DEX 4790
Страница 1: ...SPE DEX 4790 Solid Phase Extraction System Service Manual ...
Страница 6: ...5 Notes ...
Страница 35: ...34 18 0588 CE SPE DEX 4790 Key Pad 50 0145 CE Control Circuit Board 50 0027 03 External Nitrogen Regulator ...
Страница 39: ...38 ...
Страница 47: ...46 ...
Страница 59: ...58 8 Schematics 8 1 Nitrogen and Solvent Delivery System ...
Страница 60: ...59 8 2 Waste and Vacuum System ...