14
INTRODUCTION
IMPORT
ANT
PRECAUTIONS
ASSEMBL
Y
BEFORE
YOU
BEGIN
CONDITIONING
GUIDELINES
TROUBLESHOOTING
&
MAINTENANCE
LIMITED
W
ARRANTY
1
INTRODUCTION
IMPORT
ANT
PRECAUTIONS
ASSEMBL
Y
BEFORE YOU
BEGIN
CONDITIONING GUIDELINES
TROUBLESHOOTING &
MAINTENANCE
LIMITED WARRANTY
Open
HARDWARE BAG
.
Remove nylon nut, threaded screw and ball from end of
CABLE B
.
Route
CABLE B
through the pulley system in the
RADIAL ARM ASSEMBLY
as shown in
diagram.
After
CABLE B
routing is complete replace nylon nut, threaded screw and ball on end of
cable.
Hook
HANDLES
on to cable using the 2
HOOKS
.
A
B
C
D
E
ASSEMBLY
STEP
CABLE B
Qty: 1
HARDWARE BAG CONTENTS :
RUBBER STOP
BALL
NYLON NUT (C)
FLAT WASHER (B)
CABLE B
GRIP
HOOK
CLEVIS
FLAT WASHER (B)
SCREW (E)
Open
HARDWARE BAG
.
Remove nylon nut, threaded
screw and ball from end of
CABLE C
.
Attach threaded cable end
to
SINGLE
FLOATING PULLEY
BRACKET
.
Route
CABLE C
through pulley
system of
BASE FRAME
up
through the
DUAL FLOATING
PULLEY BRACKET
and back
to
BASE FRAME
and
CENTER
SUPPORT FRAME
as shown in
diagram.
After
CABLE C
routing is
complete replace nylon nut,
threaded screw and ball on end
of cable.
Hook the
LEG ExTENSION/CURL
DOWN TUBE
to the end of the
cable using the
HOOK
and the
ExTENSION CABLE
.
A
B
C
D
E
F
ASSEMBLY
STEP
CABLE C
Qty: 1
HARDWARE BAG CONTENTS :
RUBBER STOP
BALL
NYLON
NUT (C)
FLAT
WASHER (B)
HOOK
EXTENSION
CABLE
LEG EXTENSION/
CURL DOWN TUBE
CABLE SCREW
SINGLE FLOATING
PULLEY BRACKET
CABLE C
CLEVIS
FLAT WASHER (B)
SCREW (E)
S400_US_1.1.indd 14-15
8/31/07 10:10:40 AM