
Basic Operation
11
Fig. 14 Measurement Top screen
Note
The main unit is not stable while the warm-up icon blinks.
Although measurement is possible while the warm-up icon blinks, the alarm icon will blink after
measurement is finished and an invalid data error will occur (refer to "Current Alarm screen"
(page 58) and "Alarm displays and actions" (page 106)).
For correct measurement, be sure to wait until the warm-up icon turns off before starting
calibration or measurement.
For high-precision measurement, warm up the analyzer at least an hour before calibration or
measurement.
3.
Refer to "System Setting screen" (page 84) to set the date and time.
Power OFF
1.
Clean the flow paths inside the product.
Reference
"Rinsing the flow paths" (page 88)
2.
Turn OFF the power switch.
3.
Place the cap on the sample inlet.
4.
Remove the power cable plug from the power outlet.
5.
Dispose of the drainage liquid.
Reference
Содержание OCMA-500
Страница 1: ...Oil Content Analyzer OCMA 500 Instruction Manual CODE GZ0000331784D ...
Страница 20: ......
Страница 58: ...Measurement 38 Flow scheme of operation Fig 36 Operation flow of automatic measurement ...
Страница 65: ...Measurement 45 Manual measurement Flow scheme of operation Fig 45 Operation flow of manual measurement ...
Страница 140: ......