1 General information

The electrolyte of sealed lead-acid batteries is fixed in a glass fiber fleece (AGM) or gel. Therefore an upright 
or horizontal installation of battery cells or blocks is basically possible. The generation of oxyhydrogen gas is 
extremely reduced by an internal recombination circle. Sealed lead-acid battery cells or battery blocks are not 
sealed gas tightly. The integrated valve has to open by pressure overload. Sealed lead-acid batteries must 
not be opened. HOPPECKE offers numerous sealed lead-acid batteries as single cells (nominal voltage 2 V) or 
blocks (nominal tension:6 V or 12 V) for different applications. 

1.1 Safety precautions

  

Danger!

Read this documentation carefully and completely before performing any tasks using the batte-
ries. This documentation contains important information regarding the safe and correct unpacking, 
storage, installation commissioning, operation and maintenance of filled lead-acid batteries.

  Danger!

To ensure your own safety as well as the safety of your colleagues and the system, it is essential 
that you have read and understood all instructions in this documentation and adhere to them 
strictly. If you have not understood the information contained in this documentation or if local 
regulations and conditions apply which are not covered by the documentation (or run contrary to 
the information in this documentation), please contact your local HOPPECKE representative. You 
can also contact us at our head office directly.

  Danger!

If you are conducting any work on or with the battery system, it is essential that you familiarize 
yourself with the installation, operation and maintenance of lead-acid batteries.

1.2 Technical data

1.2.1 Example for single cell

Each single cell/each battery block has an own identification plate on the top side of the cell/block cap. Refer 
to the example below.

Example: The information on the identification plate is as follows: 
5 OPzV 250
5   

= number of positive plates

OPzV  = battery type
250  =  Nominal capacity C

10

 (capacity during discharge with ten 

hours´ current (I

10

) over a discharge time of 10 h (t

10

))

267  =  actual capacity C

10

 (capacity of discharge with 10 h 

current)

5 OPzV 250

2V 250Ah C

/ 267 Ah C

10

U

float

 =    2,25    V/cell

! upright position only !

Made in Germany

non spillable

1.2.2 Identification plate battery

The identification plate of the entire battery system can be found on the 
battery rack or inside the battery cabinet.
The nominal voltage, the number of cells/blocks, the nominal capacity  
(C

10

 = C

N

) and the battery type are listed on the identification plate of 

the system.

Fig. 1–1: Example for type plate on battery rack

1.3 CE-Mark

Effective as of 1 January 1997, the EC declaration of conformity 2006/95/EC (Low Voltage 
Directive) and the corresponding CE marking for the battery system are required for batteries with 
a nominal voltage between 75 V and 1500 V DC.
The installer of the battery system is responsible for displaying the declaration and affixing the CE 
label on or next to the battery’s identification plate.

1.4 Disposal and recycling

Attention!

Used batteries with this marking are recyclable goods and must be sent for recycling.

Used batteries which are not sent for recycling are to be disposed of as special waste 
under all relevant regulations.

We offer our customers our own battery return system. All lead acid batteries are taken to the 
secondary lead smelting plant at our HOPPECKE site, observing the provisions of the German
– recycling and waste law
– battery regulations
– transport approval regulations
– together with the general principles of environmental protection and our own corporate guidelines.

The HOPPECKE smelting plant is the only lead smelter in Europe certified under
– DIN EN ISO 9001 (processes and procedures),
– DIN EN ISO 14001 (environmental audit),
–  and specialist disposal regulations covering specialist disposal with all associated waste codes 

for storage, treatment and recycling.

For further information: +49(0)2963 61-280.

1.5 Service

HOPPECKE has a worldwide service network that you should take advantage of. HOPPECKE service is there for 
you whenever you need specialist consultation for installation of the battery system, parts and accessories or 
system maintenance. Contact us or your local HOPPECKE representative.

HOPPECKE service:
Email: [email protected]

Refer to the HOPPECKE website for contact data of all international HOPPECKE branches:
Internet: www.hoppecke.com

Pb

Содержание 5 OPzV 250

Страница 1: ...for valve regulated stationary lead acid batteries Installation commissioning and operating instructions Similar to the illustration...

Страница 2: ...development For this reason there may be discrepancies between the product that you have purchased and the product as represented in this documentation Please keep this documentation so that it is im...

Страница 3: ...ely from normal household wastes General notice or tip for better understanding and optimum use of the battery or batteries Pb 0 Safety notices 0 1 General Information Danger Incorrect use of the prod...

Страница 4: ...ive counterparts of old and new names In the rest of this document old names will be listed in brackets Pb Following symbols and pictograms are pictured on each battery cell or on each battery block R...

Страница 5: ...e for Maintenance Testing and Replacement of Valve Regulated Lead Acid VRLA Batteries for Stationary Applications IEEE Standard 1189 2007 Guide for Selection of Valve Regulated Lead Acid VRLA Batterie...

Страница 6: ...ls blocks into the racks 30 5 10 Connecting the batteries 32 5 10 1 Connection terminals 32 5 10 2 Type of connection cable 32 5 10 3 Clamping batteries using battery connectors 32 5 10 4 Installing t...

Страница 7: ...type 250 Nominal capacity C10 capacity during discharge with ten hours current I10 over a discharge time of 10 h t10 267 actual capacity C10 capacity of discharge with 10 h current 5 OPzV 250 2V 250A...

Страница 8: ...ly However they contain diluted sulfuric acid H2 SO4 that is bonded in gel or glass mat The bonded sulfuric acid is extremely corrosive and can cause serious injury Further information to sulfuric aci...

Страница 9: ...ic shock If a second accidental ground connection is made there is a risk of short circuit fire and explo sion If you have questions about these instructions or any other questions regarding safety wh...

Страница 10: ...r is still present to make sure that your shipment is complete compare with the delivery note In particular check the number of battery pallets and the number of boxes with accessories Then inspect th...

Страница 11: ...ention If the cells batteries are to be stored for a long period of time store them fully charged in a dry frost free location Avoid direct sunlight To prevent damage to the batteries an equalizing ch...

Страница 12: ...cell width installation depth at least 500 mm see also IEC 62485 2 USA 36 or 915 mm HOPPECKE recommendation If possible at the installation location 1 m Otherwise in accordance with local regulations...

Страница 13: ...always filled before delivery Sealed stationary lead acid battery cells must not be refilled with water during the entire battery service life Overpressure valves are used as sealing plugs These plugs...

Страница 14: ...d ventilation for hydrogen generated by batteries Chap 10 Required ventilation for hydrogen generated by bat teries 5 3 Conducting an open circuit voltage measurement Before installing the batteries c...

Страница 15: ...c tions mask bad cells and blocks and could cause individual battery strings to overload 2 Only batteries of the same type and same state of charge should be connected same battery type plate size and...

Страница 16: ...e after another into the racks so that they are angled and level with the correct polarity Remove all transportation and hoisting equipment For large batteries it is required that you begin installati...

Страница 17: ...rs must be furnished with additional insulation Avoid mechanical stress on the cell battery terminals Protect cables with large cross sections using cable ties and cable clamps The connection cables b...

Страница 18: ...brations which could loosen the connection under certain cir cumstances The cables must be supported so that no mechanical load can be transferred to the connection terminals cable trays cable ducts c...

Страница 19: ...n be omitted 6 1 Discharging Attention Never allow the final discharge voltage of the battery to drop below the voltage corresponding to the discharge current Unless the manufacturer has specified oth...

Страница 20: ...ber of cells in series occurs after charging DC power supply Electrical Load Battery 6 2 2 Floating operation The following is characteristic for this operating mode Consumers direct current source an...

Страница 21: ...on of the equalizing charge Perform the equalizing charge as follows 1 Charging with IU characteristic up to max voltage U 2 4 V cell up to 48 hours The charge current must not be higher than 20 A per...

Страница 22: ...power VR L OPzV solar power OPzV bloc solar power and sun power VR M solar bloc batteries This chapter contains instructions for charging of HOPPECKE sun power VR L OPzV solar power OPzV bloc solar p...

Страница 23: ...charge of 80 Fig 7 9 Endurance in cycles of sun power VR L OPzV solar power as a function of ambient temperature Cycle Number n Depth of Discharge DoD Cycles n Ambient Temperature in C 7 3 Temperature...

Страница 24: ...depicts dependency of the endurance in cycles on depth of discharge and temperature Fig 7 10 Endurance in cycles of sun power VR L OPzV solar power depending on DoD and temperature 7 4 3 Electrolyte f...

Страница 25: ...mum voltage is reached 11 Reconnect the battery system as originally connected and perform a boost charge see Chap 5 13 9 2 Performing the capacity test extended version Preparation The best and quick...

Страница 26: ...ecting the correct discharge current or the correct discharge power Carry out the battery discharge in accordance with the regulations on performing capacity tests EN 60896 21 The discharge current an...

Страница 27: ...ells The battery is on float charge at 2 25 V per cell CN Nominal capacity of the battery 200 Ah n Number of cells 2 x 30 cells fg Gas emissions factor 0 2 fs Safety factor 5 Ifloat 1 mA Ah Cell numer...

Страница 28: ...w of 0 6 m3 h What factors must be considered when installing a natural ventilation system If possible the ventilation openings should be positioned on opposite walls If they must both be on the same...

Страница 29: ...fire extinguishers are not suitable amongst others because of only minor efficiency possible risks or collateral damages Special protective equipment For larger stationary battery installations or lar...

Страница 30: ...67 no transport as dangerous goods non spillable batteries are not subject to other requirements of IATA DGR if they meet the requirements of Special Provision A 67 Provided that poles are secured ag...

Страница 31: ...correct or up to date Packing Instruction P 801 a transport as dangerous packing in accu Special Provision VV 14 transport as dangerous ADR Tunnel restriction code Note these references can be applie...

Страница 32: ...on dispose with due regard to the official local regu lations 7 Handling and storage Store frost free under roof Seek agreement with local water authorities in case of larger quan tities Observe VAWS...

Страница 33: ...l details in this brochure are based on state of the art technology Our products are subject to constant development We therefore reserve the right to make changes HOPPECKE Batterien GmbH Co KG P O Bo...