ADJUSTMENTS

WARNING

Adjustments must be made by qualified persons only.
If the appliance manufacturer supplies checkout and/ 
or service and maintenance instructions carefully 
follow them. 
If such instructions are not provided then use the 
procedure outlined below.
Adjustment can only be made with a special tool.

Pressure tap

The gas control is provided with a pressure tap of 9 mm O.D. 
at inlet and outlet side.

When checking the pressure undo the screw a half turn and 
slip tube over nipple.

Ensure that screw is retightened after making test.

CAUTION

To ensure a safe closing of the valves, it is essential 
that voltage over the terminals of electric operators is 
reduced to 0 Volt.

Offset adjustment  (see fig. 1.)

Remove cap screw with a Torx T-40 screw driver or 5 mm 
hex key to expose offset adjustment screw.

Check gas supply pressure to the appliance using a 
pressure gauge connected to the inlet pressure tap.

Start fan and check air flow.

Energize both electric operators in order to have gas input 
to burner and ignite boiler.

Adjust CO

2

 % at the desired value at low output with 

offset adjustment screw. Turn offset adjustment screw 
clockwise to increase CO

2

 %.

Operate boiler on high output. (Only  modulating 
applications).

Replace cap screw and tighten pressure taps.

CHECKOUT

After any adjustment check pressure taps and gas 
connections with an approved leak detection fluid for gas 
leakage.

After any adjustment set appliance in operation and 
observe a complete cycle to ensure that all burner 
components function correctly.

MAINTENANCE AND SERVICE

Under normal circumstances no maintenance or service is 
required.

WARNING

Do not disassemble the gas control; it contains no 
replaceable components.
Attempted disassembly or repair may damage the 
gas control
Screws on the valve that have been sealed must 
never be removed.

Содержание VK41 V Series

Страница 1: ...ure regulator is in accordance with class B requirement of EN 88 VK41 V VK81 V gas controls can handle the three gas families manufactured gas natural gas and LP gas VK41 VB VK81 VB gas controls can handle second family gas only SPECIFICATIONS Models VK41 0 series line voltage gas control with pilot burner connection two automatic shut off valves and pilot burner connection for direct spark igniti...

Страница 2: ... operating pressure maximum Minimum operating gas pressure 15 mbar Maximum operating gas pressure 60 mbar VK411x VK811x Class B C 30 mbar VK412x VK812x Class B B 30 mbar VK41xxVB VK81xxVB Class B C The Pmax 60 mbar indication on the housing is the maximum inlet pressure at which the gas control functions safely Maximum air pressure 8 mbar without outlet gas pressure before ignition 20 mbar with ou...

Страница 3: ...Vac or 220 240 Vac output by using a rectifier plug 45 900 441 Fig 2 Mounting of rectifier plug IMPORTANT Warranty claims are not accepted if not the specified plug rectifier circuit is used Electical protection of gas control with rectifier plug IP 40 Inlet End outlet Side outlet Body length mm Flanged Flanged 105 Flanged Flanged 105 Internal 3 8 ISO 7 1 Flanged 115 Internal 1 2 ISO 7 1 Flanged 1...

Страница 4: ...ntrol during handling Use a sound taper fitting with thread according to ISO 7 1 or a piece of new properly reamed pipe free from swarf Do not thread or tighten the pipe or pipe fitting too far see table below Otherwise distortion and malfunction could result Apply a moderate amount of good quality thread compound to the pipe or fitting only leaving the two end threads bare If permitted by local s...

Страница 5: ... off end of tubing and remove burrs Fig 6 External thread connection with nut and olive q q q q With 3 4 nut and O ring see fig 7 Pipe diameter 15 mm Nut drawing 45 006 583 003 O ring size 14 3 x 2 4 mm drawing 45 001 528 048 Fastening torque maximum 50 Nm minimum 10 Nm Pipe end construction see fig 10 Fig 7 External thread connection with nut and O ring r r r r With 3 4 nut and flat sealing ring ...

Страница 6: ...ectrical connections IMPORTANT Disconnect power supply to prevent electrical shock and or equipment damage Wiring must be in accordance with local regulations The appliance manufacturer s instructions should always be followed Before installing or replacing any control check that type number is correct for the application Ensure combustion chamber is free of gas before start up Conduct a thorough ...

Страница 7: ...tment screw Check gas supply pressure to the appliance using a pressure gauge connected to the inlet pressure tap Start fan and check air flow Energize both electric operators in order to have gas input to burner and ignite boiler Adjust CO2 at the desired value at low output with offset adjustment screw Turn offset adjustment screw clockwise to increase CO2 Operate boiler on high output Only modu...

Страница 8: ...9134 0503R20 NE 8 Home and Building Control Combustion Control Center Europe Honeywell BV Phileas Foggstraat 7 7821 AJ Emmen The Netherlands Tel 31 591 695911 Fax 31 591 695200 http europe hbc honeywell com ...

Отзывы: