MU1H-1564GE23 R1115
8
Honeywell GmbH
GB
• The national installation regulations must be observed
during the assembly.
• If installing without a refilling combination (NK300S) upst-
ream of the refilling unit (VE300S), provide a shut-off
fixture
7.2. Assembly instructions
1. Thoroughly flush pipework
2. Install refilling unit (VE300S) and mount using wall
bracket
• Install in horizontal pipeline
• Note flow direction (indicated by arrow)
• Install without tension or bending stresses
3. Screw cartridge (see accessories) into refilling unit
(VE300S) and tighten by hand
8. Start-up
8.1. Measuring the water hardness
1. Before installation, the total hardness measuring instru-
ment provided should be used to measure the water hard-
ness in order to set the electronics module.
8.2. Pre-rinsing and bleeding cartridge
1. Place bucket under system
2. Open shut-off valve on inlet
3. Open bleeder valve
4. Drain out water via bleeder valve
• approx. 5 l with P300-S
• approx. 15 l with P300-L and P300-LES
5. Close bleeder valve
6. Check cartridge for leaks
8.3. Setting up the electronics module
1. Take out electronics module
2. Insert batteries
3. Reattach electronics module
4. Set electronics module, see Operation chapter
8.4. Filling up the system
1. Slowly open shut off valves on inlet and outlet
2. Fill/refill heating system according to standard
3. To rule out the possibility of uncontrolled refilling, after
filling the system, close the shutoff valves!
9. Operation
9.1. Overview of display and control keys
9.2. Control keys
Various menu items can be accessed from the control keys.
The menu items can be paged through by repeatedly pres-
sing the corresponding control key.
The active menu item is indicated by the selection fields in the
display.
The selection is confirmed by hovering over the active menu
item for more than 3 s.
The national installation regulations apply during the
assembly.
Provide shut-off fixture to ensure that cartridges can be
replaced.
Observe the information in the instruction manual of the
total hardness test-kit
1
Display area
Plain text display for rinse, fill and
refilling quantities
2
Service LED
Flashing yellow
cartridge capacity below 10 %
flashing red + tone Cartridge capacity all used up
Cartridge in use for more than 5
years
3
Control keys
Paging through the menu items
4
Selection fields
Display of active menu item
ON/INFO
Remaining
capacity
Display of current remaining cartridge capa-
city in litres
Consumption Display of cartridge volume used to date in
litres
Total filter
Display of total volume to date in litres
Audio OFF
Switch off acoustic monitoring signal
Audio ON
Switch on acoustic monitoring signal
The factory setting is Audio ON
Wasserhärte/Hardness
(see also 8.1 Measuring water hardness)
Set the water hardness
Display switches between °dh, °fh and ppm
For water hardnesses > 26 °dh/46.3 °fh/463 ppm, the
max. water hardness should be confirmed
Kartusche/Cartridge
Ohne / none
rinsing mode without cartridge
P300-LES
Setting of installed cartridge P300-LES
P300-LESxL
Setting of installed cartridge P300-LESxL*
S
e
r v i c e
ON
INFO
Wasserhärte
Hardness
Kartusche
Cartridge
Restkapazität
Ohne / none P300 -
LES
P300 -
LESxL
P300 -
S
P300 -
L
V
e
rbrauch
Gesamtliter
Audio
3 Sec. RESET
Kapazität
Capacity
Kartusche
Cartridge
Wechsel
Change
Gesamtliter
Total liters
3 Sec. RESET
Neue Kartusche
New Cartridge
3 Sec. Ventil / Valve Modus
An / Aus
On / Off
1
2
3
4
Содержание VE300S
Страница 27: ...Honeywell GmbH 27 MU1H 1564GE23 R1115 CZ ...