Honeywell VC Series Скачать руководство пользователя страница 4

MU1H-2806GE23 R0107

5

Honeywell GmbH

GB

3. Manual Opener

The manual opener (Fig. 6) can be manipulated only 

when in the up position. 

This must be done without 

electrical hook-up. 

The motorized valve can be 

opened by firmly pushing the white manual lever down 

to midway and in. This holds the valve in the open posi-

tion, and with auxiliary switch models the N.O. switch 

is closed. 

This "manual open" position may be used for filling, 

venting, or draining the system, or for opening the 

valve in case of power failure.The valve can be 

restored manually to the closed position (stem up) by 

depressing the white manual lever lightly and then 

pulling the lever out. The valve and actuator will return 

to the automatic position when power is restored.

Note:If the valve is powered open, it cannot be

manually closed

4. Installation

4.1 General notes

The following instructions refer to the version of VC 

valve with BSPP thread. Other versions are available 

on request. Refer to the boiler manufacturer's manual 

for installation instructions and model number

4.2 Before installing this product

1. Read these instructions carefully. Failure to follow 

them could damage the product or cause a hazar-

dous condition

2. Check and make sure the ratings of this product are 

suitable for your application

3. Check the controller for SPDT or SPST output to 

make sure it matches the valve actuator selected.

4. Always conduct a thorough checkout when installa-

tion is completed

5. Disconnect power supply before connecting wiring 

to prevent electrical shock and equipment damage

4.3 Plumbing

1. While not necessary to remove the actuator from the 

body, it can be removed for ease of installation.

2. You don't need any tool to remove the actuator. The 

actuator head is automatically latched to the valve. 

To remove, (Fig. 4) press up on the latch mecha-

nism (1) located directly below the white manual 

open lever with thumb. Simultaneously press the 

actuator down towards the body with moderate 

hand force and turn the actuator counter-clockwise 

by 1/8 turn  (45 degrees). Lift actuator off the valve 

body.

3. The valve may be installed with flow from A to B, or 

B to A (Fig. 2). The valve body may be plumbed in 

any angle but not with the actuator below the hori-

zontal level of valve body (Fig. 3). Make sure there 

is enough room around the actuator for servicing or 

replacement. Install the valve in a good location for 

future maintenance, leaving an extra  25 mm head 

clearance required to remove the actuator.

4. Prepare the pipes according to valve connections.

5. For compression fitted models, tighten the compres-

sion nuts enough to make a watertight seal. 

Maximum torque limit is 45 Nm for the 22 mm 

compression fitting, and 65 Nm for the 28 mm 

compression fitting

- Take care not to over tighten

6. Either hold valve body in your hand (Fig. 5-A) or 

attach adjustable spanner (38mm or 1-1/2") across 

the hexagonal or flat faces on the valve body (Fig. 

5-B). If assembly valve train on a bench, take care 

not to deform body with vice. Do not place the raised 

"H" logo between the jaws of the vice. Excess jaw 

force can deform the body.

7.  Install the actuator by reversing the process in (2).

4.4 Commissioning hydronic system

For trouble-free operation of the product, good instal-

lation practice must include initial system flushing, 

chemical water treatment, and the use of fine system 

side stream filter(s).

Put the VC actuator manual lever (Fig. 6) in the manual 

open (middle) position to allow initial system flushing 

with the actuator mounted. This operation must be 

done without electrical hook-up

WARNING:

The products are intended to be installed 

by a trained, experienced service-person 

and according to the RATINGS given in 

the Instructions and on the product.

Содержание VC Series

Страница 1: ...VC Series Installation instruction Einbauanleitung Keep instructions for later use Anleitung zum späteren Gebrauch aufbewahren 3 Way Zone Valves 3 Wege Zonenventile MU1H 2806GE25 R0107 ...

Страница 2: ...ell com GB 1 Application 4 2 Specifications 4 3 Manual Opener 5 4 Installation 5 5 Wiring 6 6 Checkout and service 7 D 1 Anwendungsbereich 8 2 Spezifikationen 8 3 Handöffner 9 4 Einbau 9 5 Verdrahtung 10 6 Probebetrieb und Wartung 11 ...

Страница 3: ...suse of its product Voltage 230V 50 60Hz standard models 24V 50 60Hz models are available on request Power Consumption 6 Watts Max at nominal Voltage during valve position change Use 24 V class 2 transformer Provide 6 VA for transformer and connection wire size Maximum duty Cycle 15 End switch rating 2 2 A inductive from 5 to 110 Vac 1 0 A inductive above 110 to 277 Vac Min DC switching capability...

Страница 4: ...ly latched to the valve To remove Fig 4 press up on the latch mecha nism 1 located directly below the white manual open lever with thumb Simultaneously press the actuator down towards the body with moderate hand force and turn the actuator counter clockwise by 1 8 turn 45 degrees Lift actuator off the valve body 3 The valve may be installed with flow from A to B or B to A Fig 2 The valve body may ...

Страница 5: ...f the Port A opening stroke On Molex connector models valve auxiliary switch voltage must be the same to meet approval require ment Fig 3 Valve mounting position Fig 4 Removing the actuator Fig 5 Valve mounting Fig 6 The manual opener X A B Manual opener WARNING Electrical installation cables and related accessories must comply with local laws directives and competent authorities Table 1 Electrica...

Страница 6: ...one thermostat above room temperature to initiate a call for heat White valve position lever should move 2 For auxiliary switch models observe all control devices The valve should open and the auxiliary switch if present should close and make at the end of the opening stroke to activate auxiliary equip ment 3 Lower the set point of the zone thermostat below room temperature 4 Observe the control d...

Страница 7: ...en die durch falsche Verwendung oder Zweckentfremdung seiner Produkte entstehen Spannung 230V 50 60Hz Standardmodelle Modelle mit 24V 50 60Hz sind auf Anfrage erhältlich Leistungsaufnahme Max 6 Watt bei Nennspannung bei Wechsel der Ventilspannung Transformator 24 V Klasse 2 verwenden 6 VA für Transformator und Anschlusskabelgröße vorsehen Maximales Schaltverhältnis 15 Endschalterbelastung 2 2 A in...

Страница 8: ... Der entsprechende Hebel befindet sich direkt unterhalb des Hebels zur Handöffnung Gleichzeitig muss das Stellglied mit moderater Kraft nach unten auf den Ventilkörper gedrückt und im entgegengesetzten Uhrzeigersinn um 1 8 gedreht werden 45 Grad Dann kann das Stellglied vom Ventilkörper abgehoben werden 3 Das Ventil kann mit der Flussrichtung A nach B oder B nach A eingebaut werden Abb 2 Der Venti...

Страница 9: ...Anschluss muss die Spannung an Ventil und Hilfsschalter identisch sein um die Zulas sung zu erhalten Fig 3 Lage des Ventils Fig 4 Entfernung des Stellglieds Fig 5 Einbau des Ventils Fig 6 Manuelle Öffnung X A B Manual opener WARNUNG Elektrische Installationen Kabel und Zu satzbauteile müssen örtlichen Gesetzen Richtlinien und behördlichen Vorschriften entsprechen Table 1 Elektrische Anschlüsse Far...

Страница 10: ...bewegen 2 Bei Modellen mit Hilfsschalter müssen alle Regelein richtungen beobachtet werden Das Ventil sollte sich öffenen und der Hilfsschalter wenn vorhanden sollte sich am Ende des Öffnungsvorgangs schließen um die Hilfseinrichtungen zu aktivieren 3 Stellen Sie den Sollwert des Zonenthermostats auf einen Wert unterhalb der Raumtemperatur 4 Beobachten Sie die Regeleinrichtungen Anschluss A sollte...

Отзывы: