EC7830, RM7830A,EC7850A,RM7850A 7800 SERIES RELAY MODULES

66-1092—2

6. PILOT STAB. PERIOD

a.

Lockout Input opens during PILOT STAB.

b.

Airflow Switch opens during PILOT STAB.

c.

Low Fire Switch opens (EC/RM7850A).

d.

No flame is present.

e.

Ignition terminal is energized.

f.

Pilot valve/intermittent pilot valve terminal is not
energized.

g.

Main valve terminal is energized.

h.

Internal system fault.

i.

Purge card is removed.

j.

Purge card is defective.

7. MAIN TRIAL PERIOD

a.

Lockout Input opens during MAIN TRIAL.

b.

Airflow Switch opens during MAIN TRIAL.

c.

Low Fire Switch opens (EC/RM7850A).

d.

No flame is present.

e.

Ignition terminal is energized.

f.

Pilot valve/intermittent pilot valve terminal is not
energized.

g.

Pilot valve is energized during MAIN TRIAL
stabilization.

h.

Main valve terminal is not energized.

i.

Internal system fault.

j.

Purge card is removed.

k.

Purge card is defective.

8. RUN Period.

a.

No flame is present.

b.

Lockout Input opens.

c.

Ignition/interrupted pilot valve terminal is
energized.

d.

Main valve terminal is not energized.

e.

Internal system fault.

f.

Purge card is removed.

g.

Purge card is defective.

h.

Airflow Switch Input opens.

9. POSTPURGE Period

a.

Ignition/pilot valve/intermittent pilot valve terminal
is energized.

b.

Main valve terminal is energized.

c.

Internal system fault.

d.

Purge card is removed.

e.

Purge card is defective.

OPERATION

Sequence of Operation

The relay modules have the operating sequences listed
below; see Fig. 3 and 4. The relay module LED provide
positive visual indication of the program sequence: POWER,
PILOT, FLAME, MAIN and ALARM.

Initiate

The relay module enters the INITIATE sequence when the
relay module is initially powered. The relay module can also
enter the INITIATE sequence if the relay module verifies
voltage fluctuations of +10/-15% or frequency fluctuations of

±

10% during any part of the operating sequence. The

INITIATE sequence lasts for two seconds unless the voltage
or frequency tolerances are not met. When not met, a hold
condition is initiated and displayed on the optional KDM for at
least five seconds; when met, the INITIATE sequence

restarts. If the condition is not corrected and the hold
condition exists for four minutes, the relay module locks out.
Causes for hold conditions in the INITIATE sequence:

a. AC line dropout detection.

b. AC line noise that can prevent a sufficient reading of the

line voltage inputs.

c. Low line voltage brownouts.

The INITIATE sequence also delays the burner motor starter
from being energized and de-energized from an intermittent
AC line input or control input.

Standby

The relay module is ready to start an operating sequence
when the operating control input determines a call for heat is
present. The burner switch, limits, operating limit control and
all microcomputer-monitored circuits must be in the correct
state for the relay module to continue into the PURGE
sequence.

Normal Start-Up Purge

The relay module provides PURGE timing selectable from two
seconds to thirty minutes with power applied and the
operating control indicating a call for heat.

1. The Preignition Interlocks, Limits and Burner Control,

Run/Test Switch, Airflow Switch Input, Lockout Input,
and all microcomputer-monitored circuits must also be
in the correct operating state.

2. The blower motor output, terminal 5, is powered to start

the PURGE sequence. The firing rate motor is driven to
the high fire position (EC/RM7850A). The PURGE
timing does not begin until the Airflow Switch Input and
High Fire Switch (EC/RM7850A) are both closed.

3. The Preignition Interlock Input must remain closed

throughout PURGE or a safety shutdown occurs.

4. The Airflow Switch Input must close by ten seconds into

PURGE or a safety shutdown occurs.

5. After the firing rate motor reaches the PURGE rate

position and PURGE timing is completed, the motor
drives to the low fire position (EC/RM7850A).

Ignition Trials

1. Preignition: With the firing rate motor at the low fire

position (EC/RM7850A), the ignition transformer,
terminal 10, is energized for three seconds.

2. First Safety Time (SAFETY1):

a.

With the firing rate motor at the low fire position
(EC/RM7850A):
(1) The pilot valves and ignition transformer,

terminals 8, 10 and 21, are energized.
Terminal 8 is an interrupted pilot valve and
terminal 21 is an intermittent pilot valve.

(2) During SAFETY1, the Low Fire Switch Input

must be closed. If it opens, a safety
shutdown occurs (EC/RM7850A).

(3) The Preignition Interlock Input is ignored

during SAFETY1, PILOT STAB., MAIN
TRIAL, RUN and POSTPURGE.

b.

Flame must be proven by the end of three or five
seconds to allow the sequence to continue. A
safety shutdown occurs if there is no flame.

3. Pilot stabilization (PILOT STAB.): With flame proven, the

ignition, terminal 10, is de-energized. The duration of
this state is five seconds.

Содержание RM7830A Series

Страница 1: ...ES Relay Modules Checkout and Troubleshooting Product Data SPECIFICATIONS Electrical Ratings See Tables 3A 3B 3C and 3D Voltage and Frequency RM7830A and RM7850A 120 Vac 10 15 50 60 Hz 10 EC7830A and EC7850A 220 240 Vac 10 15 50 60 Hz 10 Power Dissipation 10W maximum Maximum Total Connected Load 2000 VA Fusing Total Connected Load 20A maximum type FRN or equivalent Environmental Ratings Ambient Te...

Страница 2: ...nd if not installed and used in accordance with the instructions can cause interference with radio communications It has been tested and found to comply with the limits for a Class B computing device of Part 15 of FCC rules which are designed to provide reasonable protection against such interference when operated in a commercial environment Operation of this equipment in a residential area can ca...

Страница 3: ... Voltage wiring 5 For recommended wire size and type see Table 1 6 For recommended grounding practices see Table 2 Fig 1 Internal block diagram of EC RM7830A see Fig 3 for detailed wiring instructions L1 HOT N 1 5 2 CONFIGURATION JUMPERS PLUG IN PURGE TIMER CARD F G 22 PLUG IN FLAME AMPLIFIER MICROCOMPUTER RUN TEST SWITCH RESET PUSHBUTTON FLAME SIGNAL TEST JACK RELAY DRIVE CIRCUIT 1K 2K 3K 4K 5K 6...

Страница 4: ...LAY MODULE RS485 16 1K1 2K2 5K1 4K1 7K1 2K1 PV1 PV2 MV 3K1 6K1 7 ES1 ES3 ES2 3K2 SAFETY RELAY CIRCUIT 20 6 FAN AL IGN AL DDL 13 15 14 12 HIGH FIRE COMMON LOW FIRE MODULATE REMOTE RESET 8K1 8K2 9K2 9K1 INDICATES FEEDBACK SENSING OF RELAY CONTACT STATUS AND LINE VOLTAGE INPUTS RELAY CONTACT OPEN INTERNAL WIRING FIELD WIRING RELAY COIL RELAY CONTACT CLOSED DDL COMMUNICATIONS 1 2 3 5 F G 22 USER TERMI...

Страница 5: ...ER PILOT FLAME MAIN ALARM STANDBY RUN STANDBY PRE IGNITION PILOT STABIL MAIN STABIL IGNITION BURNER POSTPURGE MAIN VALVE LIMITS AND BURNER CONTROL CLOSED LOCKOUT INPUT 10 sec AIRFLOW SWITCH CHECK PILOT VALVE V2 PREIGNITION INTERLOCK OPTIONS SAFE START CHECK FLAME PROVING 3 sec 5 sec 5 sec 1 IF ON AT CALL FOR HEAT HOLD 120 sec LOCK OUT IF STILL ON 3 or 5 sec 3 or 5 sec SAFE START CHECK IF OFF AFTER...

Страница 6: ...OWER PILOT FLAME MAIN ALARM STANDBY RUN STANDBY PURGE OR WAITING PRE IGNITION PILOT STABIL MAIN STABIL IGNITION BURNER POSTPURGE MAIN VALVE LIMITS AND BURNER CONTROL CLOSED LOCKOUT INPUT 10 sec AIRFLOW SWITCH CHECK PILOT VALVE V2 PREIGNITION INTERLOCK OPTIONS SAFE START CHECK FLAME PROVING 3 sec 5 sec 5 sec 1 IF ON AT CALL FOR HEAT HOLD 120 SEC LOCK OUT IF STILL ON IF OFF AFTER 10 SEC OF FAN LOCK ...

Страница 7: ...ength of all Data ControlBus Module interconnecting wire is 4000 feet 1219 meters 10 Be sure loads do not exceed the terminal ratings Refer to the label on the relay module or to the terminal ratings in Tables 3A 3B 3C and 3D Final Wiring Check 1 Check the power supply circuit The voltage and frequency tolerance must match those of the relay module A separate power supply circuit can be required f...

Страница 8: ... at PF 0 5 20A inrush d 10 IGN Ignition 120 Vac 2A at PF 0 2 d F 11 Flame Signal 60 to 220 Vac current limited 16 Control Voltage 120 Vac 10 15 17 ES2 Preignition Interlock Input 120 Vac 1A 10A inrush for 5000 cycles Carry 5A for 250 000 cycles 20 LOS Lockout Input 120 Vac 1 mA 21 PV2 Pilot Valve 2 Intermittent 120 Vac 4A at PF 0 5 20A inrush d 22 SHTR Shutter Shutter drive for dynamic self check ...

Страница 9: ...PF 0 5 20A inrush c 6 RT Limits and Burner Control 120 Vac 1 mA 7 LD2 Airflow Switch Input 120 Vac 5A 8 PV1 Pilot Valve 1 Interrupted 120 Vac 4A at PF 0 5 20A inrush d 9 M V Main Fuel Valve 120 Vac 4A at PF 0 5 20A inrush d 10 IGN Ignition 120 Vac 2A ignition d F 11 Flame Signal 60 to 220 Vac current limited 12 HI Firing Rate High Fire 120 Vac 0 5A at PF 0 5 e 13 COM Firing Rate Common 120 Vac 0 5...

Страница 10: ...ATIC CHECKOUT After checking all wiring perform this checkout before installing the relay module on the wiring subbase These tests verify that the Q7800 Wiring Subbase is wired correctly and the external controllers limits interlocks actuators valves transformers motors and other devices are operating properly WARNING Fire or Explosion Hazard Can cause property damage severe injury or death Close ...

Страница 11: ...for correct connections tight terminal screws correct wire and proper wiring techniques 8 Replace all damaged or incorrectly sized wires 9 Replace faulty controllers limits interlocks actuators valves transformers motors and other devices as required 10 Make sure normal operation is obtained for each required test before continuing the checkout 11 After completing each test be sure to open the mas...

Страница 12: ... 1 Recycle limits 2 Burner control 6 4 16 5 4 2 7 1 Fan Burner Motor or Blower starts 2 Line voltage at terminal 7 1 Fan circuit a Manual fan switch b Fan power supply overload protection and starter c Fan 2 Running limits of Airflow Switch LD2 input NOTE Remove jumpers and re connect alarm if used 7 4 10 Ignition spark if ignition transformer is connected to terminal 10 1 Watch for spark or liste...

Страница 13: ...abled and the Airflow Switch is closed for 120 seconds with Limits and Burner Control closed d Ignition pilot valve intermittent pilot valve terminal is energized e Main valve terminal is energized f Internal system fault g Purge card is not installed or removed h Purge card is defective i Lockout Input opens during STANDBY 3 PURGE Period a Preignition Interlock opens anytime during purge b Flame ...

Страница 14: ... detection b AC line noise that can prevent a sufficient reading of the line voltage inputs c Low line voltage brownouts The INITIATE sequence also delays the burner motor starter from being energized and de energized from an intermittent AC line input or control input Standby The relay module is ready to start an operating sequence when the operating control input determines a call for heat is pr...

Страница 15: ...releases to modulation 2 The relay module is now in RUN and remains in RUN until the controller input terminal 6 opens indicating that the demand is satisfied or a limit has opened Postpurge The relay module model specific provides a two 15 or 30 second POSTPURGE following the completion of the RUN period The blower motor output is powered to drive all combustion products and any unburned fuel fro...

Страница 16: ...umpers The relay module has three site configurable jumper options see Fig 6 and Table 6 If necessary clip the site configurable jumpers with side cutters and remove the resistors from the relay module The relay module reads the settings of these configuration jumpers at startup After 200 hours of main valve operation the relay module locks the jumper settings into internal memory If these jumpers...