Test Your Building Design on F
IRST
V
ISION
Enabling F
IRST
V
ISION
to Monitor Your Building
27
F
IRST
V
ISION
™
Installation and Operation Manual
- P/N: 53034:Rev: A2 10/29/07
3.9 Test Your Building Design on F
IRST
V
ISION
It is recommended that you simulate an event that F
IRST
V
ISION
processes that will test the
interaction between your building design and F
IRST
V
ISION
response to that event. The following
are some items to verify that they are functioning correctly:
• Battery-backup system is functioning correctly.
• F
IRST
V
ISION
starts monitoring your building life safety system when started.
• The floor plan background images are correctly displayed on F
IRST
V
ISION
.
• Auto unlock of F
IRST
V
ISION
enclosure when an event that F
IRST
V
ISION
processes is
received by F
IRST
V
ISION
.
• Activated device icons are shown in their correct locations over the floor plan background
on F
IRST
V
ISION
.
3.10 Touch Screen Calibration
F
IRST
V
ISION
’s touch screen was calibrated in the factory and you should not have to perform this
procedure.
If you have determined that the cursor is not correctly tracking to the position of your finger then
you can use the GenCalb function to calibrate the touch screen.
3.10.1 How to Calibrate F
IRST
V
ISION
’s Touch Screen
Step 1. Unlock and open the product’s glass paneled door using the factory supplied key.
Step 2. Connect the external keyboard and mouse to the product to the appropriate connectors.
Refer to “What To Connect and How To Make the Connections” on page 15.
Step 3. Press the ESC key on the keyboard to shutdown the software application.
Step 4. Locate and click on the Desktop icon for touchscreen calibration.
Step 5. Follow the displayed instructions to calibrate the touch screen.
Step 6. Restart the software application by clicking on F
IRST
V
ISION
’s software application
Desktop shortcut.
Step 7. Remove the external connected components.