HP300ULX Installation Document  P/N 52386:A  12/29/05

Before connecting power, review the entire wiring diagram for correct installation (see Fig. 1).  With the AC power 
disconnected, connect 120VAC to the Fuse Block as follows; L=Black (HOT), N=WHITE (Neutral), G=GREEN 
(Ground).   Select the output voltage 12VDC or 24VDC using Jumper J1 of the Power Board J1 OFF=12VDC, J1 
ON=24VDC. Voltage is Factory set and Re-Adjusting will void 

Warranty

.

3. Output Connections

Connect the load to the DC (+) and DC (-) terminals observing polarity.

4. Alarm/Trouble Output

a.) AC Fail

: Connect the “AC Fail” output “Form C” dry contacts to the monitoring device.  In case of AC loss the 

relay, which is Fail Safe, will de-energize within one (1) minute. 

b.) Battery Fail:

  Connect the Battery Fail output “Form C” dry contacts to the monitoring device. If a Battery is not 

connected or improperly connected, the Yellow LED (L3) will turn ON within one (1) minute and the Battery Fail 
output relay, which is Fail Safe, will de-energize. 

5. Power Up

When all wiring is complete and checked, switch ON the AC Power.  The Green Led (L1) will come ON indicating AC 
presence and the AC relay will be energized.  Connect Battery observing the correct polarity.  For 24VDC use the battery 
link provided to connect the two (2) 12 Volt Batteries in series.  Secure the enclosure with the 4 screws and with the Key 
Lock provided.  

NOTE: For UL603 or UL294 applications use a Tamper Switch (Catalog number HPVM3 available separately), 
and included enclosure key lock. Connect the tamper switch NC outputs to monitoring device to notify of 
enclosure tampering.

   

  

4 Maintenance

This unit should be tested at least once a year to verify correct operation in accordance with the following 
recommendations;

Output Voltage Test
Voltage output should be tested under normal load conditions to verify correct levels. 

Battery Test
Battery should be checked for full charge under normal load conditions.  This check should verify correct voltage at 
both battery terminals and also at the Battery output point on the board to ensure the integrity of all connecting 
wiring.

Note:

  It is recommended to replace the battery at least every 4 years.

!

WARNING: To reduce risk of electric shock, do not expose unit to rain or excess moisture, and disconnect 
power before servicing unit.

For continuous protection against hazard, replace fuses only with exact type and rating.  A readily accessible 
switched circuit breaker must be available to disconnect main power as required.  All power limited  wiring should 
be routed so that it cannot touch non-power limited wiring; minimum spacing 1/4”.  Installation and servicing 
should only be made by qualified personnel; contains no user-serviceable parts.  Install in accordance with all local 
regulations and the National Electrical Code.

Continued on next page...

Содержание HP300ULX

Страница 1: ...output on AC Failure within one minute 4 Built in charger for sealed lead acid or gel cell type batteries 5 Instantaneous transfer to stand by battery on AC failure 6 Battery presence detection within 1 minute 7 Battery low disconnect at 9 90VDC or 19 90VDC 8 High voltage disconnect at 15VDC or 30VDC 9 Yellow LED L3 indication for battery disconnected and battery low 10 Fail safe dry contact outpu...

Страница 2: ...osure with the 4 screws and with the Key Lock provided NOTE For UL603 or UL294 applications use a Tamper Switch Catalog number HPVM3 available separately and included enclosure key lock Connect the tamper switch NC outputs to monitoring device to notify of enclosure tampering 4 Maintenance This unit should be tested at least once a year to verify correct operation in accordance with the following ...

Страница 3: ...present Output Battery Capacity STBY ALRM 4Hr Stand By 15Mins ALRM 24Hr Stand By 15Mins ALRM 60Hr Stand By 5Mins ALRM 12Ah 12V STBY 2 00A N A N A ALRM 2 00A N A N A 17Ah 12V STBY 2 00A 200mA N A ALRM 2 00A 2 00A N A 55Ah 12V STBY 2 00A 1 50A 300mA ALRM 2 00A 2 00A 2 00A 12Ah 24V STBY 2 00A N A N A ALRM 2 00A N A N A 17Ah 24V STBY 2 00A 200mA N A ALRM 2 00A 2 00A N A 55Ah 24V STBY 2 00A 1 50A 300mA...

Страница 4: ...0ULX Installation Document P N 52386 A 12 29 05 For additional information Visit our website at http www honeywellpower com Contact Technical Support at 1 877 HPP POWR E mail us at hpp techserv honeywell com ...

Отзывы: