Vigilon fire system
Mounting & cable entry points
These instructions cover installation of the panel and battery box. The cards and
batteries are installed during the commissioning of the system by the servicing
organisation.
The control panel can be surface or
fl
ush mounted. The only time it should not be
fl
ush
mounted is when the battery box is close
fi
tted beneath the control panel.
Any unused knockouts that have been removed must not be left open.
502mm
390mm
Mains supply
cable
Knock outs
8-off Earth points
(1-0ff bottom side
on the right hand)
Back box
for VIG-72 shown
5-off Backbox
fixing points
(includes
1 keyhole)
1.7m
Floor level
Dust
cover
over
backplane
Earth to
Inner door
Backplane
0V
to printer
PSU
Fitted on VIG1-72 only
Adhesive backed foam pad
to seal up gap to prevent
ingress
Cable entry points
18 - Back
21 - Top
3 - Bottom side (on the right)
a. Identify the package VIG1-24 / VIG1-72 and check that it contains all the parts.
b. Remove the temporary cover from the Back box.
c. Knock out/in the required cable entry points from the Control panel back box and
from the Battery box.
d. Use the
fi
xing points provided to mount the Back box and Battery box to the wall
using suitable
fi
xings.