
Quick Start: DC Charge
Controller for
Honeywell Wind Turbine WT6500 - Rev 2.0 - 29Nov11
8
Quick Start
Figure 1:
Pole Mount
Pole Mount
Step 1:
• Position Leg Weldment
#WTM001 to bottom of
#WTM002 Coupler Weldment.
• Bolt together using fastener #’s:
70210, 70714, 71021, 71071 as
shown.
• Repeat pattern in three additional
locations.
Step 2:
• Position Mounting Bracket
#WTM003 to top of #WTM002
Coupler Weldment.
• Bolt together using fastener #’s:
70210, 70714, 71021, 71071 as
shown.
Note:
Be sure both pole and pole cou-
pler are installed level. Failure to
install them level will impact turbine
performance and may impact
warranty coverage.
Be sure the inner surface of the
Mounting Leg Weldment is flush
against the pole prior to bolting the
fasteners. Choose the bolt hole in
the base of the Pole Mount Turbine
Coupler Weldment that aligns with the
slot in the Mounting Leg Weldment.
Pole Top Mount Assembly #WTMASSY001
Item No.
Part No.
Description
Qty
1
WTM001
Mounting Leg Weldment
4
2
WTM002
Pole Mount Turbine Coupler Weldment
1
3
WTM003
Pole Mount Junction Box Mounting Bracket
1
5
Fastenal #70210 Hex Cap Screw, 1/2-13 x 1.75” lg Full Thread 18-8 S/S
9
6
Fastenal #71071 Flat Washer - 1/2”, Medium Split, 18-8 Stainless Steel
9
7
Fastenal #71021 Flat Washer - 1/2”, Small O.D., 18-8 Stainless Steel
9
8
Fastenal #70714 Hex Nut - 1/2-13 - 18-8 Stainless Steel
9