
Quick Start: DC Charge
Controller for
Honeywell Wind Turbine WT6500 - Rev 2.0 - 29Nov11
4
Quick Start
Site Survey
Refer to the Site Survey Guide.
Evaluation and Installation List
Permits
Permit#_________________________ Date_____________
Permit#_________________________ Date_____________
Permit#_________________________ Date_____________
Permit#_________________________ Date_____________
Site Evaluation
Distance from Turbine to DC Charge Controller (max 200 ft. (60 m))______
Height to center of turbine______________________________
Draw all obstructions on site map
Draw Site Map
(View from above - use space on page 6 for your drawing)
Prevailing wind direction
Location of:
Obstacles
Turbine
DC Charge Controller
Battery Enclosure (max 6 ft. (1.8 m) from DC Charge Controller)
Mounting Hardware
(Choose one or have your local PE design a custom mount -
see Honeywell
Wind Turbine WT6500 Owner’s Manual
for more details)
Pole: Height____________ Material_______________ with Pole Top Mount (refer
to pages 8- 9)
Flat roof: Ballast Mount (refer to page 10)
Pitched roof:
ROOFBOX
with Extended
QUADPOD
Mount (refer to page 11)
Accessories
(Supplied by Installer)
(4) Batteries: 12 V, 100 Ah, deep cycle batteries - Type may be AGM or marine-
grade flooded
Battery enclosure
(1) 30 Amp fuse (refer to page 15)
(1) 15 Amp fused disconnect (refer to page 15)
(1) Battery switch (refer to page 15)