
Setpoint Programmers
View/Edit profile
Revision 9
900 Control Station User Guide
129
May 2014
View/Edit profile
This display lets you view or edit parameters of the currently working profile. Edits affect only the
currently working program (not the profile in memory) and are lost if the profile is Reset, unless you Save
Profile to Memory.
ATTENTION
Program must be in READY state to be edited.
Item
Description
View/Edit Segments Button
Accesses View/Edit Profile Segments (page 131) where you can edit each
segment.
Profile number
Memory location of the profile that is being run by the Setpoint
Programmer.
Profile Name
Name of the selected profile.
Profile Description
Description of the profile.
Ramp Type
TIME: Each ramp segment’s time is the TIME allotted to the profile’s
output to reach the next soak segment’s value in hours or minutes.
OR
RATE: Each ramp segment’s time specifies the RATE at which that
profile’s output will reach the next soak segment, where the rate is
specified in EU/hour or EU/minute.
Make this selection before entering any Ramp during Profile Edit.
NOTE: When Ramp unit is configured for TIME, entering “0” will imply an
immediate step change in setpoint to the next soak.
Time Units
This selection assigns the time units (hours or minutes) for the ramp type
selected.
For Time ramp type: Time = Hours or Minutes
For Rate ramp type: Rate = EU/Hour or EU/Minutes
Primary Output Label
Label associated with the PV.
Primary Engineering Units
Engineering Units of the PV
Guaranteed Hold High Limit
The profile will hold if a PV deviates more than this amount above the
profile setpoint.
Guaranteed Hold Low Limit
The profile will hold if a PV deviates more than this amount below the
profile setpoint.
Содержание ControlEdge 900 platform
Страница 128: ...116 900 Control Station User Guide Revision 9 May 2014 This page is intentionally left blank ...
Страница 170: ...Loops Loop Setup 158 900 Control Station User Guide Revision 9 May 2014 This page is intentionally left blank ...
Страница 191: ...Revision 9 900 Control Station User Guide 179 May 2014 ...