background image

Honeywell GmbH

12

Translation of original  -  MU1H-1376GE23 R1215

GB

8. Start-up

8.1 Safety instructions for start-up

Inform yourself sufficiently about 
• the equipment of the compact booster unit
• the functionality of the compact booster unit
• the close surroundings of the compact booster unit
• the measures to be taken in an emergency

8.2 Start-up requirements 

Before start-up of the compact booster unit, the following points have to be 
ensured: 
• The compact booster unit has to be connected to all protective equipment 

according to the regulations. 

• The relevant VDE and country-specific regulations have to be adhered to 

and fulfilled.

• The buffer tank has to be full of water. 
• The refilling has to function properly. 
• Flange connections have to be checked if they are fastened tightly. 
• Pipe fittings between pump and pipeline have to be tightened. 
• In and output openings for air-cooling of the motor are free. 
• The precharge pressure of the membrane pressure vessel is checked.
• All shut-off valves in the system are open. 

8.3 Initial operation

The initial start-up should be performed by Honeywell technical staff.

1. Connect electrical circuit on-site. 
2. Connect water supply for refilling on-site.
3. Open or loosen the ventilation screws on the pump (refer to operating/ 

assembly instructions). 

4. Slowly open the shut-off valves on the input side and fill the system until 

water runs out of every ventilation borehole.

5. Close the ventilation screws, tighten pump ventilation lightly. 
6. Set main switch to

 I

7.  Check direction of pump rotation. 

- The direction of rotation has to be the same as the direction shown by the 

arrow on the motor. If it is rotating in the wrong direction, two phases of 
the inlet have to be exchanged. 

8.  Slowly open the shut-off valve of the output and use the pressure gauge 

to check if the system starts if the switch-on pressure is reached (refer to 
Chapter 5.). 
- If the switch-on pressure is set to the wrong value, it has to be changed 

as described in chapter 8.3.1.

9. Slowly close the shut-off valve of the output and use the pressure gauge 

to check if the system shuts off when the switch-off pressure is reached  
(refer to Chapter 5.).
- If the switch-on pressure is set to the wrong value, it has to be changed 

as described in chapter 8.3.1.

10.Let the pump run again with the output shut-off valve open, loosen the 

ventilation screw and let the rest of the air out. 

11.Close the ventilation screw tightly. 
12.Check if the pump runs smoothly. 

8.3.1 Change switch-on pressure

1. Click on the settings key indicated by as spanner symbol
2. Move up and down using the arrow keys to setting value 1-2-3-3
3. Press OK key 
4. Move up and down using the arrow keys to desired setting value for the 

discharge pressure in bars.

5. Press OK key confirm the set value
6. For any further information please Refer to instructions of frequency 

inverter 

8.4 Switching the system on 

1. Secure the shut-off valves of the in and output against being closed.
2. Operate the main switch to supply the system with voltage.

- The green LED indicates that the unit is ready to use. 

Performance of tasks only by qualified personnel (see section 1.12).

Warning

†

Danger from improper operation.

ª

Malfunctions



Before starting, the manual has to be read by the operator as 
well as by the responsible technical/operating personnel and 
has to be stored at the site of the compact booster unit at all 
times.



Adhere to local safety and accident regulations when starting 
the compact booster unit.

†

Damaged or improperly installed compact booster unit.

ª

Malfunctions



Check the compact booster unit for obvious signs of damage; 
eliminate any defects immediately or alert the supervising 
personnel.  The compact booster unit may only be operated in 
perfect working order.

Caution

†

Dry running pump 

ª

Damage to the pump/system! 



Ensure that there is no water shortage.

The responsible authorities have to be informed before start-up and be-
fore testing. 

Caution

†

The pipeline must be free of residue 

ª

Danger of damaging the pump/compact booster unit! 



Before start-up (and testing) make sure that pipelines and 
compact booster unit are free of residues. 

Caution

†

No pressure on the output side

ª

Pump starts when main switch is turned on!



During start-up and also during automatic mode, the pump 
starts as soon as the main switch is turned on, because the 
system receives a start command from the pressure sensor due 
to the lack of pressure on the output side. This is not even 
prevented if the motor protection switch is also activated.

In case of water shortage the system does not start.

The start-up, or testing mode, of the compact booster unit may only be 
initiated if all VDE regulations have been fulfilled. 
Floating ring seals may briefly show signs of leakage during start-up, 
but no longer after a short period of operation. 

Содержание CBU146

Страница 1: ...CBU146 Compact Booster Unit To ensure the quality of potable water according to EN1717 Instructions 32303735 001 ...

Страница 2: ...ndicator LED 8 4 4 Mode of operation 8 5 Technical data 9 5 1 Noise expectancy values 9 5 2 Authorised environmental conditions 9 6 Shipping 10 6 1 Check condition upon delivery 10 6 2 Transportation 10 7 Assembly 10 7 1 General safety instructions 10 7 2 Installation according to EN1717 10 7 3 Inspection before assembly 11 7 3 1 Installation site 11 7 4 Installing the compact booster unit 11 7 5 ...

Страница 3: ... with local regulations that are not covered by the manual 1 4 Further safety regulations Besides the safety instructions presented in this manual and its intended use the following safety regulations are valid Accident prevention regulations safety and operating regulations Safety regulations for handling hazardous substances Applicable standards and laws 1 5 Unauthorised operation types The limi...

Страница 4: ...ronmental hazard caused by leakage of hazardous substances Danger area Type of hazard Reduction of hazard Pipelines Injury through high pressure Clear pipelines of pressure and medium prior to assem bly maintenance shut down Danger area Type of hazard Reduction of hazard Injury from cables Danger to life Electric shock of 230 400V from electric voltage Connect up protective earth system Always swi...

Страница 5: ...l power supply companies 1 11Safety instructions for maintenance inspections and assembly work Alterations or modifications of the system are only permitted with the consent of the manufacturer Use only original parts or parts authorised by the manufacturer Use of parts other than those authorised may lead to loss of liability for any damage they may cause Perform service on the system only when t...

Страница 6: ...nd perfect condition This instruction manual is a part of the compact booster unit and has to be complete and accessible at all times Any instruction or page that is missing has to be replaced immediately 2 4 Illustrations The illustrations used are examples of one possible version of the compact booster unit and might differ in individual cases from the actual compact booster unit version 2 5 Sym...

Страница 7: ...t can result in danger to persons systems the surroundings and the environment Operate the compact booster unit only if it is in perfect working condition Do not operate the compact booster unit if it is only partially assembled The compact booster unit may only be used to pump the medium as described in the documentation of the respective version Never operate the compact booster unit without pum...

Страница 8: ...lug connectors to connect easily with the electrical equipment fitted to the supply container Messages sent via potential free contact for Alarms and warnings Pump run indicator 3 5 Options 4 Function 4 1 Inlet side On the inlet side there is a buffer tank It has a floating valve on its inlet to refill water The water level is measured with two float switches They send messages in the case of wate...

Страница 9: ...Weight m3 h m3 h m Inlet Pump P2 kW l mm mm mm kg CBU146 32A 060 0 6 7 0 86 G11 4 DN32 2 2 350 1543 800 1185 195 CBU146 40A 060 1 1 11 0 89 G11 4 DN40 3 0 350 1600 800 1185 218 CBU146 50A 060 1 6 19 0 85 G2 DN50 5 5 540 1965 800 1600 324 CBU146 65A 060 4 0 28 0 81 G2 DN65 7 5 540 1990 800 1600 346 CBU146 65B 060 4 0 34 0 100 G21 2 DN65 11 0 540 1990 800 1600 444 CBU146 80B 060 4 6 43 0 86 G21 2 DN...

Страница 10: ...e has to be solid level and horizontal Observe the weight information The compact booster unit is attached to wooden rails and wrapped in foil for transport and temporary storage All connection interfaces have protective lids Danger Danger for persons near by systems and the the environment that arises from the non intented use of the compact booster unit Operate the compact booster unit only as i...

Страница 11: ...pipelines so that they are free of tension The use of compensators with tie bars refer to the accessories section is recommended Caution Overflow not connected ª Danger of flooding the installation room Lead the overflow line to a drain with adequate dewatering capacity connection DN150 If compensators are used to damper vibrations their durability has to be ascertained Compensators have to be abl...

Страница 12: ...put shut off valve open loosen the ventilation screw and let the rest of the air out 11 Close the ventilation screw tightly 12 Check if the pump runs smoothly 8 3 1 Change switch on pressure 1 Click on the settings key indicated by as spanner symbol 2 Move up and down using the arrow keys to setting value 1 2 3 3 3 Press OK key 4 Move up and down using the arrow keys to desired setting value for t...

Страница 13: ...h the motor protection switch does not securely shut off the motor inlet lines Only perform maintenance work on the compact booster unit if you are sure that the compact booster unit is free of power Secure the compact booster unit against being switched on unintentionally Danger Danger of injury from electric voltage ª High shock currents and burns from direct and indirect contact with live parts...

Страница 14: ...the shut off drain and check valves function proper ly and don t leak 5 Clean the dirt trap in the pressure reducing valve if applica ble 6 Check the compensators for wear if applicable 7 Check the precharge pressure and if necessary check if the membrane pressure vessel leaks refer to Chapter 10 3 1 9 Check the switch on off points of the system 11 Check if the entire system is functioning proper...

Страница 15: ...propriate lifting moving of heavy modules or components ª Personal and property damage When moving heavy modules or components use suitable transport devices lifting devices and lifting accessories Warning Danger through improper disassembly Performance of tasks only by qualified personnel see section 1 12 B It is imperative to observe the laws and regulations on waste disposal of materials that a...

Страница 16: ...els then the TÜV has to be informed also The operating company or their customer herewith certifies to be fully trained in operation and maintenance of the compact booster unit The circuit diagrams and instructions were also delivered 1 Compact booster unit Series Size Serial number Order number 2 Customer Operating site Customer Operating site Name Address 3 operating data refer to circuit diagra...

Страница 17: ... handling The following safety precautions regarding rinsing medium residual fluids and their disposal are required We ensure that the above information is correct and complete and delivery will be made according to statutory requirements Type Order number Order item number3 Delivery date Range of application Pumped medium3 radioactive explosive corrosive poisonous hazardous to health biohazard fl...

Страница 18: ...ble water this central booster unit requires frequent maintenace contucted by enabled personal which needs to be documented after compleshion This compact booster unit is subject to the standards for potable water and guidelines for maintenance therein and have to be maintained regularly by qualified personnel and the results have to be documented Date Operating company Name Signature ...

Страница 19: ...MU1H 1376GE23 R1215 Translation of original 19 Honeywell GmbH GB ...

Страница 20: ...1 81309 http ecc emea honeywell com Manufactured for and on behalf of the Environmental and Combustion Controls Division of Honeywell Technologies Sàrl Z A La Pièce 16 1180 Rolle Switzerland by its Authorised Representative Honeywell GmbH MU1H 1376GE23 R1215 Subject to change without notice 2015 Honeywell GmbH ...

Отзывы: