5-3
HRN216
ENGINE REMOVAL/INSTALLATION
9. Support the engine, and remove the four 5/16-24 x 1
inch engine mounting bolts.
10. Remove the engine.
INSTALLATION
Installation is done in the reverse order of removal.
• Be sure to install the flywheel brake cable Z-fitting cable
end through the top side of the brake lever.
•
VKA type:
- Adjust the belt guide (
).
- Be sure the belt is properly routed through the shutter
assembly (
• Be sure the blade holder Woodruff key is properly
installed, and properly tighten the blade holder bolt.
Failure to do so will result in blade holder bolt failure that
can cause the blade holder to come off.
Tighten the engine mounting bolts to the specified torque.
TORQUE: 21.6 N•m (15.9 ft-lb)
5/16-24 x 1 in BOLT (4)
21.6 N•m (15.9 ft-lb)
Содержание HRN216 Series
Страница 4: ...1 1 1 SPECIFICATIONS 1 SPECIFICATIONS 1 2 3 WIRING DIAGRAM VLA TYPE 1 5 2 DIMENSIONAL DRAWINGS 1 3...
Страница 9: ...1 6 SPECIFICATIONS HRN216 NOTES...
Страница 62: ...4 1 4 BLADE HOLDER ROTO STOP 1 BLADE HOLDER DRIVE PULLEY 4 2 2 ROTO STOP DRIVE PULLEY 4 6...
Страница 75: ...4 14 BLADE HOLDER ROTO STOP HRN216 NOTES...
Страница 76: ...5 1 5 ENGINE REMOVAL INSTALLATION 1 PKA VKA TYPES 5 2 3 VYA TYPE 5 6 2 VLA TYPE 5 4...
Страница 83: ...5 8 ENGINE REMOVAL INSTALLATION HRN216 NOTES...
Страница 84: ...6 1 6 MUFFLER 1 REMOVAL INSTALLATION 6 2...