WHEEL/ROTOR/TRANSMISSION
15-6
ROTOR REMOVAL/INSTALLATION
• The right side rotor and left side rotor can be
removed in the same manner.
• After installation, make sure that the right and left rotors are symmetry (page 15-9).
R. FRENCH ROTOR
LOCK PIN
Right side shown:
MARKS
TRANSMISSION
MARK
TRANSMISSION
DISASSEMBLY/ASSEMBLY:
(page 15-7)
When installation, make sure
that the "R" and "L" marks are
facing up.
When installation, make sure
that the "R" and "L" marks are
facing up.
SHAFT PIN (8 x 40 mm)
Содержание FQ650
Страница 7: ...MEMO ...
Страница 13: ...SPECIFICATIONS 1 6 WIRING DIAGRAM R SPARK PLUG Bl R Bl UNIT IGNITION COIL ENGINE STOP SWITCH Bl BLACK R RED ...
Страница 21: ...SERVICE INFORMATION 2 8 TUBE ROUTING FUEL TUBE BREATHER TUBE HIGH TENSION CORD ...
Страница 37: ...MEMO ...
Страница 43: ...MEMO ...
Страница 45: ...FUEL SYSTEM 5 2 FUEL SYSTEM TOOLS Float level gauge 07401 0010000 ...
Страница 53: ...MEMO ...
Страница 67: ...MEMO ...
Страница 74: ...9 1 9 dummytext 9 MUFFLER MUFFLER REMOVAL INSTALLATION 9 2 ...
Страница 76: ...10 1 10 dummytext 10 ENGINE REMOVAL INSTALLATION ENGINE REMOVAL INSTALLATION 10 2 ...
Страница 78: ...11 1 11 dummytext 11 CLUTCH PULLEY V BELT REMOVAL INSTALLATION 11 2 ...
Страница 81: ...MEMO ...
Страница 111: ...MEMO ...
Страница 129: ...MEMO ...