8-11
dummyhead
dummyhead
GENERATOR/CHARGING SYSTEM
REAR HOUSING/STATOR
INSTALLATION
Assemble the rear housing, stator and stator cover with
the bolt (page 8-10).
Install the stator and rear housing assembly (1) to the
front housing.
MAIN WINDING INSPECTION
VOLTAGE INSPECTION
Remove the generator end cover (Base shop manual:
page 5-2).
Start the engine and measure the AC voltage between
the terminals according to the table below.
SH, SKH type
LDH type
(1)
Main winding terminal
Voltage
(VAC)
(Red) –
(Blue)
220 ± 11
Main winding terminal
Voltage
(VAC)
(Red) –
(Blue)
240 ± 12
(Red) –
(White)
120 ± 6
(Blue) –
(White)
SH, SKH type:
LDH type:
Содержание EM10000K1
Страница 5: ...1 1 1 dummytext 1 SPECIFICATIONS SERIAL NUMBER LOCATION 1 2 SPECIFICATIONS 1 2 PERFORMANCE CURVES 1 4 ...
Страница 22: ...MEMO dummyhead dummyhead ...
Страница 23: ...7 1 7 dummytext 7 GOVERNOR SYSTEM GOVERNOR ARM CONTROL REMOVAL INSTALLATION 7 2 ...
Страница 40: ...MEMO dummyhead dummyhead ...
Страница 41: ...9 1 9 dummytext 9 IGNITION SYSTEM IGNITION COIL INSPECTION 9 2 ...
Страница 52: ...MEMO dummyhead dummyhead ...
Страница 58: ...MEMO dummyhead dummyhead ...